The short answer
Almost every new-build home in the UK is now built with full fibre. In England the building rules have required a gigabit-capable connection since 26 December 2022, and Scotland and Wales have followed. That is good news, but it is not the whole story. The rules make the developer connect your home to one fast network, subject to a cost cap. They do not order broadband for you, and they do not guarantee you a choice of networks or providers.
So the questions that matter are practical: which network has been built to your plot, which providers sell over it, when you can order, and what to do if the choice is narrow. Rules and provider details were checked in October 2026; your developer's information and your own contract are what count.
How broadband reaches a new-build home
On a new development the network is built at the same time as the houses: the developer arranges for one or more network operators to lay fibre into the site. A network operator owns the cables (Openreach, for example). A provider (internet service provider, ISP) is the company you pay each month. Sometimes they are the same company and sometimes not, and that difference shapes how much choice you get.
Full fibre (also called FTTP, fibre to the premises, meaning the fibre runs all the way into your home rather than stopping at a street cabinet) is now standard on new builds. ISPreview, using thinkbroadband data, reported in July 2025 that around 99% of new-build homes are built with full fibre support, up from about 60% in 2017.
Inside, you will usually find a small box called an ONT (optical network terminal), which turns the light signal in the fibre into something your router can use. Openreach says that in new builds it is usually in a service cupboard or under the stairs. Our guide to what a full fibre ONT is explains more.
Who builds the networks on new developments
Openreach connects the largest share of new homes, but several other operators build on new estates too. ISPreview's July 2025 report, based on thinkbroadband figures for live lines, listed the leading full fibre operators by new-build premises in 2024/25:
Network operator | New-build premises (2024/25) |
|---|---|
Openreach | 89,466 |
Hyperoptic | 24,766 |
OFNL (GTC/BUUK) | 11,936 |
FibreNest (Persimmon Homes) | 3,931 |
Virgin Media (full fibre) | 1,519 |
4th Utility | 494 |
Community Fibre | 267 |
Grain Connect | 244 |
CityFibre | 223 |
YouFibre | 151 |
The report noted that only live lines are counted, so the newest builds may be missing. It also said that OFNL had agreed to buy FibreNest. We could not confirm in October 2026 whether that deal has completed or whether it has changed which providers sell on FibreNest sites, so check the providers listed for your exact address rather than relying on the table. Which operator serves your plot decides which providers you can choose from.
What the gigabit building rules require
Building regulations are set separately in each UK nation. England went first, so we start there.
England: Part R of the Building Regulations
Regulations that came into force on 26 December 2022 added two requirements for new homes to Part R of the Building Regulations 2010, with official guidance in Approved Document R Volume 1:
- Requirement RA1, gigabit-ready infrastructure. The developer must install the physical routes for a fast connection, such as ducting, up to a network distribution point (or as close as reasonably practicable if it does not have rights over the land in between). This applies even if no gigabit connection ends up being installed, so the home is ready for one later.
- Requirement RA2, a gigabit-capable connection. Each new home must be given a working connection to a gigabit-capable network, meaning one capable of download speeds of at least 1,000Mbps (1Gbps), subject to a cost cap of £2,000 per home.
Before work starts, the developer must give building control a connectivity plan naming the network the homes will be connected to, along with evidence for any exemption it is relying on.
The £2,000 cost cap and the fallbacks
The £2,000 cap includes VAT and covers the connection only, not the ducting, the developer's admin costs or the broadband service you later buy. Any contribution a network operator makes is deducted before the cap is applied. When the government published its guidance for developers in January 2023, it said Openreach, Virgin Media and Gigaclear had committed to contribute to connection costs. Openreach also says its full fibre for new developments is free to developers on sites of 20 or more plots.
If a gigabit connection can't be had within the cap, the developer must fit the next fastest connection that can:
- a gigabit-capable connection (at least 1,000Mbps download), or if not possible within the cap
- a high-speed connection (at least 30Mbps), or if not possible
- a USO-standard connection, meaning at least the 10Mbps minimum download speed set for the broadband Universal Service Obligation (USO).
If even a USO-standard connection would cost more than the cap, the connection requirement does not apply. The ducting requirement usually still does, unless the home is in an isolated area where the prospect of any connection is too remote to justify it (Approved Document R Volume 1, paragraphs 1.6f and 2.19). A developer relying on that isolated-area exemption has to give building control evidence for it. A developer can only claim it couldn't connect within the cap if it invited at least two suitable network operators to offer and none did so at or under the cap within the time allowed. (The regulation gives 30 days from the invitation; the guidance document refers to 30 working days.)
Which new homes are covered in England
Approved Document R says the rules cover new homes on housing developments, self-build new homes and new homes in mixed-use developments. Its own example of the last is a live/work unit: a home that is also a workplace for people who don't live there.
They do not cover homes created by converting an existing building (for example an office turned into flats, which the regulations call a material change of use), existing buildings undergoing major renovation, or rooms in hostels, hotels and similar. There is also a transitional rule: developments whose building notice, initial notice or full plans went in before 26 December 2022 are outside the rules, as long as work started on site within 12 months. So a home completed in 2024 or 2025 is not automatically covered; it depends on when that development was submitted.
A new block of flats needs a shared access point and cabling to every flat, with room for at least one gigabit-capable connection per flat. See our guide to full fibre in a block of flats.
Scotland, Wales and Northern Ireland
Wales: the Building etc. (Amendment) (Wales) Regulations 2025 came into force on 1 July 2025 with rules that mirror England's, including the £2,000 per-home cost cap (including VAT, and excluding the ducting and the developer's admin costs), the same fallbacks to a high-speed and then a USO-standard connection, and the same test of inviting at least two suitable providers. The transitional rule mirrors England's too: work notified before 1 July 2025 is outside the rules if it started before that date or within 12 months of it.
Scotland: the Building (Scotland) Amendment Regulations 2024 came into force on 1 January 2025. They add a building standard requiring gigabit-ready infrastructure inside new buildings, a common access point and, to the extent that it is reasonably practicable, a connection to a gigabit-capable network. ISPreview reported that the Scottish approach applies a £2,000 cost cap to the connection, with the next fastest connection within the cap as the fallback and ducting still required where no connection is possible.
Northern Ireland: we have not confirmed whether there is an equivalent rule. Openreach runs a separate site-registration route for developers there. If you are buying in Northern Ireland, ask the developer directly which network is being installed and whether a connection is included.
What the rules don't promise
Four limits are worth knowing before you move in:
- A connection, not a broadband service. Approved Document R says the developer must provide a working connection to a gigabit-capable network but does not have to secure a service with a provider. Choosing and ordering broadband is still your job.
- One network is enough. Developers may install more than one network, but it is voluntary. They can use the first suitable operator they deal with. Nothing in the rules guarantees a choice of networks.
- Not necessarily fibre. The rules are technology neutral. The connection can be full fibre or cable, or, where they can meet the speed requirement, fixed wireless or satellite. In practice most new homes get full fibre, as the figures above show.
- Not Wi-Fi in every room. Each home needs at least one network termination point (where the network enters your home) in a sensible spot, usually inside in an open area with a fixed power supply. The guidance notes that Wi-Fi from there may not reach every room. Our guide to mesh Wi-Fi and Wi-Fi extenders can help.
Questions to ask the developer before you complete
Ask at the sales office, ideally before you reserve, and get replies in writing where you can.
- Which network operator is building the fibre to my plot? Ask for a name, not just "fibre is included".
- Is there more than one network on the development? If so, which plots does each one reach?
- Is the network live yet, and from what date can I order a service? Openreach asks developers to register sites at least six months before the first home needs broadband, so the developer should know well ahead.
- Which providers can sell over that network? If the developer doesn't know, the operator's website often has a list or a postcode checker.
- Is any broadband deal attached to the home, or am I free to choose any provider on the network?
- Where will the ONT or termination point be, and is there a power socket next to it? A cupboard under the stairs may not be the best spot for Wi-Fi coverage.
- Are there any wired data points? See our guide to wired Ethernet in the home.
- Who do I contact if the connection isn't working when I move in?
Ordering broadband for move-in day
Openreach advises starting to plan as soon as you know your completion date.
- Confirm the network. Use the answers from the developer, then check your new address on the network operator's own checker. Our guide on how to check full fibre availability at an address walks through the checkers and what their results mean.
- See who sells on it. Enter your new postcode in the comparison on our fibre broadband deals page to see deals available through our comparison partner, or browse the broadband providers directory, then confirm with the provider at your full address before you commit. Our broadband deals by area pages are another starting point. If your address doesn't appear, ask the developer or the network operator whether it has been set up on their systems yet.
- Check timing with the provider. Openreach says most providers need the connection to be ready before they accept an order, so you may not be able to order months in advance.
- Allow for set-up. On an Openreach full fibre new build, once the line is ready you usually just plug the router into the ONT, typically without an engineer. Other networks work differently; Hyperoptic, for example, says most new customers need an installation appointment, though it also says residents in its new builds can get online as soon as they have their keys. TalkTalk warns that moving into a newly built or converted home can cause delays where cabling is still needed. See our guide to broadband installation lead times.
- Read the contract summary. Check the minimum term, any set-up or connection fee and the price after any discount ends. On OFNL's networks, for example, there is no cost to you for building the network to your property boundary where the housebuilder contracted OFNL, but OFNL says the provider you choose will charge a connection cost, so ask what it is before you order.
If only one network serves your estate
Whether this matters depends on what kind of network it is.
Open-access networks: several providers, often smaller names
Some operators only build and run the cables, and invite providers to sell over them. OFNL is an example: it describes its new-build networks as open access, with a choice of 18 residential providers. Its list is made up of smaller brands such as Seethelight, Kinetic Telecom and Vfast, and availability varies by postcode. OFNL notes that providers must sign its agreement to connect, and that BT has signed but only sells business services there, so it can't currently offer home broadband on OFNL.
Openreach also sells access to all providers on the same terms, and says it has more than 690 communications providers as customers, so an Openreach-connected home usually has plenty of providers to choose from.
Networks that sell their own service
Other operators build the network and sell broadband over it themselves. FibreNest runs full fibre on Persimmon and Charles Church developments and takes orders for its own broadband through its website. Hyperoptic builds its own network, mostly into flats and new-build developments, and sells its own broadband. 4th Utility says it partners with landlords, property developers and house builders to install its own fibre, naming developers such as Crest Nicholson and David Wilson Homes. Its sister brand Rise Fibre sells over 4th Utility's network in selected blocks of flats and new-build developments, but mostly over Openreach and CityFibre. These smaller independent networks are often called altnets (alternative networks to Openreach and Virgin Media); as the table above shows, a few others, such as Community Fibre, Grain Connect, CityFibre and YouFibre, also had small numbers of new-build homes live in 2024/25.
Here you may have only one provider to choose from. That isn't automatically bad, but with no competition on your doorstep the contract terms deserve a careful read. Our explainer on what an altnet is covers how these networks differ from Openreach.
Keeping your options open
- Look at shorter contracts. Ofcom's rules mean providers in scope must offer at least one contract of 12 months or less. Some operators that sell over their own network go further: FibreNest offers 12-month and 30-day options alongside 24-month contracts, Hyperoptic sells monthly rolling plans in some locations, and 4th Utility offers 30-day plans (as does its sister brand Rise Fibre). Rise Fibre says its 30-day plans cost more, and both Rise Fibre and 4th Utility say their 30-day plans have more frequent price reviews, so compare the total cost over the time you expect to stay. Our guide to rolling monthly broadband contracts weighs this up.
- Switching later is easier than it used to be. Since 12 September 2024, One Touch Switch lets you move between providers, including those on different networks, by contacting only the new provider. So if a second network reaches your estate later, moving is simpler; just check for early exit fees first.
- Register interest with other networks. Hyperoptic and 4th Utility both let you register interest in a building that isn't connected yet; 4th Utility says it starts installing in a building once enough interest is registered, but where its network isn't installed there is no estimated date and it can't guarantee it will install soon. Hyperoptic says registering doesn't guarantee service. Hyperoptic also says its network can sit alongside other operators' networks in the same development.
- Consider mobile broadband as a stop-gap or second option. 4G and 5G home broadband uses a plug-in hub that connects to the mobile network instead of a cable, with no engineer needed. Speeds depend on the signal at your address, but it doesn't depend on which network the developer chose. Three's home broadband works this way, for example.
If there's no gigabit connection, or it isn't working
Some new homes legitimately end up without a gigabit connection, for instance where every option exceeded the cost cap or the development pre-dates the rules. Where the England rules apply, the ducting should usually still be there for a network to use later. Ask the developer which exemption applied.
If there is supposed to be a connection but it isn't working, Openreach suggests this route for its own network:
- The developer is still on site: ask them to check the Openreach equipment has been fully installed and nothing is missing or damaged. They can contact Openreach to fix it.
- A provider says you can't order: contact Openreach directly.
- You've ordered and the service has a problem: contact your provider, which will run tests and involve Openreach if needed.
On other networks, start with your provider (OFNL, for example, tells residents to contact their provider about faults), or the network operator if you haven't ordered yet. Our broadband speed test is a quick way to record what you are actually getting before you call.
If you genuinely can't get a decent service, the broadband USO lets eligible homes that can't get 10Mbps download and 1Mbps upload request an upgrade from BT (or KCOM in Hull), subject to eligibility; a 4G hub can count as a decent connection, and industry pays up to £3,400 (excluding VAT) per home. Our guides to getting broadband at an address with no line and the broadband Universal Service Obligation cover the options in detail. New-build homes are generally outside the government's Project Gigabit rollout, because the building rules are expected to cover them.
Your phone line and other services
Openreach is moving UK phone lines to digital by January 2027, so home phone calls run over the broadband connection and some older handsets may not work. If you want a home phone, order it with your broadband.
If anyone moving in uses a personal alarm or telecare device, tell your provider before installation and check the device works with a digital line. Our guides to the digital landline switchover and telecare alarms on a digital landline explain what to check.
New-build broadband FAQs
Do new-build homes have to come with gigabit broadband?
In England, most new homes submitted for building approval from 26 December 2022 must be given a working connection to a gigabit-capable network, as long as it costs no more than £2,000 per home. If that isn't possible, the developer must provide the next fastest connection within the cap. Openreach says similar rules started in Scotland on 1 January 2025 and in Wales on 1 July 2025.
Does the developer choose my broadband provider?
The developer chooses which network is built to your home, and that decides which providers can sell to you. The developer doesn't have to arrange a broadband service for you, so you still pick and order your own provider from those available on that network.
What is the £2,000 cost cap for new-build broadband?
It is the most a developer in England has to spend per home on a gigabit connection, including VAT. It excludes the ducting, the developer's admin costs and the cost of your broadband service, and any network operator contribution is deducted first. If gigabit costs more, the developer must fit the fastest option within the cap.
Why can't BT or other big providers sell broadband on my estate?
If your estate is served only by a network the big providers don't use, they can't sell there. On OFNL networks, for example, BT has signed the agreement but only sells business services, and networks such as FibreNest and Hyperoptic sell their own broadband. Openreach-connected homes usually have many providers to choose from.
Do the gigabit rules apply to converted flats or self-builds?
In England, self-build new homes are covered, as are new homes in mixed-use buildings. Homes created by converting an existing building, such as offices turned into flats, are not covered, and nor are existing homes undergoing major renovation. Developments submitted before 26 December 2022 are also outside the rules if work started within 12 months.
What can I do if my new-build broadband isn't working?
If the developer is still on site, ask them to check the network equipment is complete and undamaged. On Openreach's network, contact Openreach if a provider says you can't order, and contact your provider if a service you've ordered has a fault. If you can't get 10Mbps at all, look at the broadband USO.