Yes, you can get broadband without an existing line
Some properties have never had a working phone line, such as a converted barn or chapel, a flat carved out of a former shop, or a cottage whose old line was removed long ago. None of that stops you getting broadband, but there may be building work between ordering and getting online, so it pays to plan.
Openreach, whose network BT and many other providers use, says that where there is no existing line or connection, installation work may be needed first, and your broadband provider checks what is required and arranges it. You deal with the provider, not Openreach.
This guide covers older properties, conversions, self-builds and outbuildings. If you are buying from a housebuilder, read our guide to broadband in a new-build home instead. Details were checked in October 2026; what your provider tells you at order is what counts.
Step 1: find out what the address can actually get
An address with no line can still sit next to a full fibre network, a Virgin Media cable or a wireless mast. Which networks reach the property decides who can connect you and how much work is involved.
- Openreach's Fibre Checker shows whether an existing property can get Full Fibre (fibre all the way to the building, also called FTTP) or FTTC (fibre to the street cabinet, then copper to the home). If not, you can register for updates.
- Ofcom's broadband checker shows, by postcode, the fastest speeds network operators predict: standard (under 30Mbps), superfast (30 to 300Mbps) or ultrafast (over 300Mbps). Actual availability at a particular property may differ. Where fixed lines are poor, it points you to satellite, fixed wireless and the Universal Service Obligation.
- Ofcom's mobile checker shows likely 4G and 5G signal, including an "indoor coverage" result, which matters if you might use mobile broadband as a stop-gap.
Then run the postcode through the comparison on our broadband deals by area page, or the fibre broadband deals page if full fibre looks likely. It shows deals from providers selling at that postcode through our comparison partner. A listed deal tells you a provider sells nearby, not that your building can be connected without work; the provider's own address check and survey settle that.
Step 2: order from a provider and ask the right questions
You can order from any provider on the Openreach network that sells in your area, and it works with Openreach to book whatever is needed. The provider confirms when the service should be ready once you order.
One timing trap: Openreach says most providers need the connection to be ready before they accept orders. So ask early how it handles a property with no line, rather than assuming you can order a month before moving in and find everything waiting.
What providers say about new connections
What some providers say on their own pages and terms (checked October 2026):
Provider | What it says about homes needing a new line |
|---|---|
Works with Openreach where a new line or Full Fibre work outside the property is needed. | |
Never-connected homes typically need an engineer to run a cable to a Virgin Media socket. | |
New connections get a professional installation including a new master socket. | |
Its terms say a new line takes about four weeks (about ten working days on an existing line). | |
A home connecting to full fibre for the first time needs an engineer, usually around 14 days away; a start date shown with AM or PM means a visit. | |
Installs can be booked 14 to 90 days after ordering; where an engineer visit is needed, dates are typically available within around three weeks. |
These describe standard processes, not promises for your property; digging or a new pole can take longer. Our guide to how long broadband installation takes covers typical waits in each situation.
Questions to ask before you commit
- Is a new line or survey needed? Say plainly that there is no existing line, and whether the building is a conversion or set back from the road.
- Are there any extra charges? We found no published Openreach or BT price for this, so ask the provider to confirm any installation or construction charges in writing before work starts.
- Can I order now, or only once the connection is ready?
- Can I cancel without paying if the survey finds extra costs?
You don't need a phone service to get broadband
Openreach is moving the UK's phone lines to digital by January 2027, with calls running over the broadband connection, so a phone service is a separate choice. BT, for example, says its home broadband includes no call service (no dial tone and no emergency calls) unless you add its Digital Home Phone. If you want a landline number at the new property, or you rely on a telecare alarm, raise it when you order. Our guide to the digital landline switchover explains what changes.
Surveys and building the connection
If a property has unusual access requirements, Openreach may carry out a survey before installation. Its engineers also do pre-visits before some full fibre installs to check the network is ready, such as nearby underground cables or whether a telegraph pole can take a new fibre line. You usually don't need to be there, and in most cases the installation appointment is confirmed a few days afterwards. Truespeed, for instance, surveys the route for a new line usually a week or two before installation, without you needing to be home.
What can slow the build down
Openreach's common reasons for full fibre delays include:
- digging or clearing ducts, either soft digging by hand on surfaces like grass or hard digging by specialist civils (civil engineering) teams;
- cutting back trees, scaffolding for work at height, or road closures;
- removing water or debris from underground chambers and ducts, or needing a specialist engineer;
- permission from a local council or property owner, sometimes in the form of a wayleave (see below).
TalkTalk also warns that a newly built or converted home can bring delays because cabling may be needed, and council permission can add time. With a fixed moving-in date, build in slack and line up a temporary connection.
What happens on installation day
For a full fibre connection on the Openreach network, the engineer runs a fibre cable from the nearest connection point, an underground duct or an overhead pole, to a small junction box (15cm by 13cm) on an outside wall. A 12mm hole is drilled through the wall, and an ONT (optical network terminal, the box that converts the fibre signal, around 13cm by 11cm) is fitted inside. The line is then tested.
- Router position: the ONT is not a router. Your provider's router plugs into it with an Ethernet cable, so pick a spot near a double power socket that suits Wi-Fi coverage.
- Time: most Openreach full fibre installs take one to four hours; extra work such as clearing blocked ducts takes longer.
- Who must be there: someone over 18, to give access and agree where equipment goes. The engineer may ask you to sign a permission-to-work form before digging or drilling.
The ONT and its internal cabling belong to Openreach and should stay put; removing them could lead to a call-out charge. In a conversion, decide where the ONT and router go before plastering is finished. Our guides to what happens at a full fibre installation and the ONT and your router go into more detail.
Conversions, self-builds, long drives and outbuildings
In England, building regulations treat homes differently depending on how they came into being. Since 26 December 2022, Approved Document R has required newly built homes, including self-builds, to get a gigabit-capable connection, subject to a cost cap; conversions are not covered. These rules apply in England only, so in Scotland, Wales or Northern Ireland don't assume the same applies.
Barn, chapel and commercial conversions
The requirement to install a gigabit-capable connection, called RA2, does not apply to new homes created by a "material change of use" (converting a barn, chapel, shop or office into a home), or to existing buildings undergoing major renovation. Major renovations come under a separate requirement (R1) about the physical infrastructure inside the building, such as space and routes for cabling, rather than an actual connection. So if you buy a converted barn, don't assume the developer arranged broadband: ask what was installed and check the address yourself.
Self-builds
A self-build home in England counts as a new dwelling, so RA2 applies. The building work must include a gigabit-capable connection unless that would cost more than £2,000 per home (Approved Document R, 2022 edition), in which case the next fastest connection available within that cap is required. The guidance expects at least two suitable network operators to be asked before relying on the cap, so raise broadband with your builder or architect at the design stage.
You can register a site of any size with Openreach, from a single home to a large development. It asks for registration at least eight weeks before work starts on site and/or six months before you want broadband at the property.
Long drives, listed buildings and other non-standard installs
Networks define a "standard" installation; anything outside it may need a survey and sometimes a fee agreed in advance. For example (checked October 2026):
- Gigaclear says listed buildings, a longer distance from the property boundary to the building, and surfaces such as block paving, concrete or tarmac can put a job outside its standard service. It then does a survey and may discuss a customer contribution, which it says happens in only a small number of cases. If you know your property falls into one of these groups, tell it when you order so it can go straight to a survey.
- Trooli says properties classed as "Non Duct Lead In" (no existing duct to carry the cable in) need an external survey and may pay a fee agreed in advance.
- Zzoomm surveys jobs expected to take more than four hours.
- YouFibre's standard install covers terminals within 100m of the nearest distribution point.
If your building is far from the road, listed or reached across a special surface, expect a survey and ask about costs first. Openreach says standard installations don't need planning permission; for anything unusual on a listed building or in a conservation area, ask the provider what is proposed and check with your council if unsure.
Garden offices, annexes and outbuildings
First decide whether the outbuilding needs its own connection. If it has its own postal address and is lived in separately, start with the same checks as any other property. If it is a garden office or studio belonging to your home, you may be able to extend the house connection instead. Our guide to getting Wi-Fi to a garden office or outbuilding compares the ways to do that.
Wayleaves: when the cable crosses someone else's land
If the cable has to cross land you don't own, such as a farm track, a neighbour's field or a shared drive, the network may need a wayleave: a written legal agreement with the landowner giving permission to install, maintain and repair equipment there.
- Openreach can't start work until the wayleave is signed, so a delay here holds up the whole job.
- It pays landowners only where its equipment on their land serves someone else, such as you.
- Wayleaves are usually ongoing, and later owners of the land stay bound by rights already agreed.
- If a landowner refuses, Openreach has powers under the Electronic Communications Code to seek consent through the courts, but says it doesn't want to use them unless it absolutely has to.
If you rent, you also need your landlord's permission before any drilling or installation work. Our guide to broadband wayleaves covers refusals and your options.
Getting online while you wait, or instead of a line
A fixed line can take weeks, and for some remote buildings it may never be practical at a reasonable cost. Three kinds of service need no phone line. Government describes fixed wireless (which includes 4G and 5G) as typically superfast or ultrafast and sometimes gigabit, and satellite as useful for remote areas. How well each works depends on your location.
4G and 5G home broadband
If indoor mobile signal is good, this is often the fastest option to get running. Three says its home broadband hub needs no engineer and no landline, with next-working-day delivery if you order before 8pm, though speeds aren't guaranteed and depend on hub position, terrain and walls. Vodafone offers a self-installed 5G service with an indoor hub or an Outdoor Hub depending on signal, on rolling one-month plans as well as 12 and 24-month contracts. A rolling monthly plan suits a stop-gap, because it doesn't tie you in for a year or two after the fixed line is working. Our guide on whether 4G or 5G can replace a fixed line explains how to judge your signal.
Fixed wireless
Fixed wireless sends broadband by radio from a mast to a receiver on your home, with no digging. Airband says its service works on a line-of-sight principle (the receiver needs a clear view of the mast), that it surveys before installing, and that its receivers range from 130mm to 400mm across. Its fixed wireless packages include a free survey and installation. Quickline says its fixed wireless installation is charged and subject to survey. See fixed wireless broadband for rural homes for more.
Satellite
Starlink uses low earth orbit satellites. It says speeds are maximums rather than guaranteed and can be slower at busy times, and offers a 30-day trial with a full refund. Not every property has a clear view of the sky or a good place for the dish, and ISPreview reports that some locations attract a congestion charge. Our guide to satellite broadband in the UK covers the details.
If no decent connection is on offer: the USO and community schemes
If no provider will connect the building at a sensible cost, two routes remain.
The broadband Universal Service Obligation
Since 20 March 2020, eligible homes and businesses have had a legal right to request a broadband connection of at least 10Mbps download and 1Mbps upload. This is the Universal Service Obligation (USO). BT handles requests across the UK, and KCOM in the Hull area.
BT's page (checked October 2026) says you can apply if:
- you have no access to a decent, affordable connection now, with "affordable" meaning monthly charges of no more than £59.60;
- you won't get one through a public scheme within 12 months; and
- you can't get a connection through a 4G hub.
On costs, industry contributes up to £3,400 (excluding VAT) per premises. Any excess is shared between the eligible premises in the build area. If the shared excess comes to less than £5,000 per premises, you pay only your share; above that, you have to fund the whole excess. BT aims to build within 12 months, up to 24 for some.
ISPreview reported in July 2026 that Ofcom confirmed Starlink meets the USO criteria, so BT need not build a USO connection where Starlink is available, and that many applicants have been offered 4G or 5G through EE. ISPreview adds that some locations can attract a hefty Starlink congestion charge, and in those niche cases you can still ask BT for a USO connection. The USO may therefore end in a wireless offer rather than a new line. Our guide to the broadband USO explains the process step by step.
Community schemes
Openreach's Fibre Community Partnership is aimed at communities outside its own build plans and those of other networks and public projects. It works out a custom plan with the community, co-funded by the community and Openreach; you register interest through the Fibre Checker using "keep me updated". Its page still mentions Gigabit Broadband Voucher funding, but GOV.UK says that scheme closed to new projects on 31 August 2026, with existing projects delivered by 31 March 2028 at the latest. Our guide to what to do when full fibre isn't in your street covers these routes.
Checklist: connecting a property with no line
- Check availability on Openreach's Fibre Checker, Ofcom's broadband checker and its mobile checker (indoor 4G and 5G).
- Compare providers at the postcode with our deals by area comparison, and see our broadband providers hub for local full fibre networks.
- Tell the provider there is no line and ask about surveys, extra charges (in writing), when you can order and whether you can cancel if costs rise.
- Decide on a phone service if you need a landline number or rely on a telecare alarm.
- Line up permissions: your landlord's if you rent, and a wayleave if the cable crosses someone else's land.
- Plan where the ONT and router go, near a double socket.
- Arrange a stop-gap, such as a rolling 4G or 5G plan, if needed.
- If nothing decent is available, look at the USO and community schemes.
Broadband with no phone line FAQs
Can I get broadband if my house has never had a phone line?
Yes. A home with no existing line can still be connected, but installation work may be needed first. You order from a broadband provider, which checks what is required at the address and arranges the work with the network, such as Openreach. You don't need to buy a phone service to get the broadband connection.
How long does it take to get broadband at a property with no line?
It depends on the network and the work involved. POP Telecom's terms say a new line takes about four weeks; Gigaclear says install dates are typically available within around three weeks where an engineer is needed. Digging, poles, permissions or wayleaves can add time, and the provider confirms a ready date after you order.
Do I need planning permission or a wayleave for a new broadband connection?
Openreach says standard installations don't need planning permission. A wayleave, a written agreement with a landowner, may be needed if the cable crosses land you don't own and serves you rather than the landowner. Work can't start until it is signed. Renters need their landlord's permission before drilling.
Will I have to pay extra for a new line to a converted barn or long driveway?
Possibly. Some full fibre networks treat listed buildings, long distances from the boundary and special surfaces as non-standard installs needing a survey; Gigaclear may then discuss a customer contribution, though it says that happens only in a small number of cases. Ask your provider to confirm any extra costs in writing first.
What can I use while I wait for a fixed line to be built?
4G or 5G home broadband is often the fastest to get running if indoor signal is good: you plug in a hub, with no engineer or landline. Some providers offer rolling one-month plans, which suit a short wait. Check indoor coverage on Ofcom's checker first; satellite and fixed wireless suit areas with weak mobile signal.
Can I use the Universal Service Obligation if my property has no connection at all?
You can request a USO connection from BT (KCOM in Hull) if you have no decent, affordable connection, none is due through a public scheme within 12 months, and you can't get one through a 4G hub. Costs above £3,400 per premises may be shared or passed on. Where Starlink is available it can count as an alternative, unless a hefty congestion charge applies there.