What the broadband USO is
The broadband Universal Service Obligation, usually shortened to the USO, is a legal right to request a decent broadband connection if you can't get one at your home or business. It is not an automatic upgrade. Nobody will knock on your door and fit faster broadband because your line is slow: you have to ask, your address has to meet the eligibility rules, and in some cases you may be asked to pay towards the cost of the build.
The right comes from The Electronic Communications (Universal Service) (Broadband) Order 2018 (SI 2018/445), made under the Digital Economy Act 2017. It was laid on 28 March 2018 and the USO went live on 20 March 2020. The universal service rules in place since 2003 only covered a basic telephone service with data rates good enough for "functional internet access", a standard ISPreview noted could technically be met by a dial-up connection.
Three design points matter:
- It's technology neutral. The law sets the standard the connection must meet, not how it's delivered. A fixed line, a fixed wireless link or a mobile (4G/5G) home broadband service can all count if they hit the specification.
- It has a cost limit. The government designed the USO to be paid for by industry rather than public money, with a cost threshold of £3,400 per premises. Above that, the person asking pays the difference or the request doesn't go ahead (more on that below).
- Two companies deliver it. BT is the designated provider across the UK, except the Hull area, where KCOM is responsible.
What counts as 'decent' broadband under the USO
The legal specification is set out in Schedule 1 of the 2018 Order. A USO connection must have all of these characteristics:
Requirement | Minimum standard | What it means in plain terms |
|---|---|---|
Download sync speed | At least 10Mbps | "Sync" is the rate agreed between your equipment and the network for receiving data, not a promise of what every speed test will show. |
Upload sync speed | At least 1Mbps | Sending data: video calls, photo backups, attachments. |
Contention ratio | No higher than 50:1 | Contention is how many users share the same capacity. 50:1 is the maximum level of sharing allowed. |
Latency | Good enough to make and receive voice calls effectively | Latency is the delay as data travels to its destination and back. Ofcom's figure, as reported by ISPreview, is no more than 200 milliseconds (200ms). |
Data | At least 100GB a month | A small capped allowance wouldn't qualify. |
The connection also has to be affordable. BT and KCOM both state Ofcom's threshold as no more than £59.60 a month (checked October 2026). It was £45 a month including VAT when the USO launched in 2020. KCOM explains that it covers the total charge (rental and connection, including VAT) over the contract's minimum term and is adjusted for CPI inflation. BT makes the point that "affordable" is about the monthly broadband charges, not the cost of building the network to you.
The 10Mbps figure was set by the government in March 2018. BT cites Ofcom research that 10Mbps is the minimum an average household currently needs. It's a floor, not a target: our guide on what broadband speed you need helps you work out what your home needs.
Who qualifies
The law (Schedule 1 of the 2018 Order) sets four conditions. A USO connection can be requested if:
- the connection is to a fixed location that is a residence or place of business;
- a prospective end-user (the person who'd use it) asks for it;
- a connection meeting the specification isn't available at that location and won't be made available through a publicly funded scheme within one year of the request; and
- the connection costs no more than £3,400, or it costs more and the end-user pays the costs above £3,400.
BT's own wording adds a practical detail: you must not be able to get a connection through a 4G hub in your region. So if a mobile home broadband service at your address meets the specification at an affordable price, you're likely to be told you don't qualify, even if your phone line is slow.
The same can apply to satellite: Ofcom has confirmed that Starlink meets the USO criteria (more on that, and the exceptions, further down).
Unusual homes
The legal test is a "fixed location which is a residence or place of business". For a park home, static caravan, houseboat or residential mooring we couldn't find a clear published answer from BT, so ask the help desk and get the answer in writing.
A quick self-check before you call
- Run a few tests on our broadband speed test at different times of day and note the results. A speed test isn't the same as the sync speed the law uses, but it's useful evidence of what you actually get.
- Enter your postcode in the comparison on our broadband deals by area page to see which deals our comparison partner lists for your address. Treat it as a starting point, not an eligibility test: it doesn't show upload sync speeds, it may not include every option (satellite, for example), and a deal advertising 10Mbps doesn't prove the USO standard is met. BT's postcode checker and help desk make that call.
- Check whether public money is already planned for your address. In England and Wales, GOV.UK's gigabit availability checker shows whether gigabit broadband is available or planned; Scotland and Northern Ireland have their own checkers (see the alternatives section below). A publicly funded build due within a year can rule out a USO request.
BT and KCOM: who to contact
Which company handles your request depends on where the address is: BT, or KCOM if you live in the Hull area. Northern Ireland's Department for the Economy states plainly that you don't need to be an existing customer of BT or KCOM to apply.
BT | KCOM | |
|---|---|---|
Area covered | The UK outside the Hull area | The Hull area |
How to request | Check your postcode on BT's USO page, then call the universal service help desk on 0800 783 0223 | Call 01482 602555 |
Eligibility answer | Can take around 30 days | Up to 30 days |
If the cost is over £3,400 | Full survey and final quote, which can take 60 days | Full survey and detailed quote within 60 days if you want to go ahead |
The USO is rarely used in Hull. KCOM says the vast majority of premises in its area can get its Lightstream full fibre, and where an exception applies it makes sure standard ADSL is available. Its own performance report for March to August 2026 records one USO request and one confirmed order in that six months. KCOM also offers Flex packages for people on low incomes, and if money is the issue rather than availability, our guide to broadband social tariffs explains the cheaper deals for people on certain benefits.
If you're simply weighing up BT's everyday packages rather than a USO build, see our BT broadband deals page.
How to request a USO connection, step by step
This is the BT process as BT describes it. KCOM's runs to similar timescales.
- Check your postcode on BT's USO page. It shows what's already available; if BT thinks you might be eligible, it points you to the help desk.
- Call the universal service help desk on 0800 783 0223. Have your address and speed test results to hand.
- Wait for the eligibility check. BT confirms whether you qualify and whether the estimated cost of connecting you is under £3,400 excluding VAT. BT says this may take 30 days.
- If the estimate is over £3,400, BT can carry out a full survey and give you a final quote. This may take 60 days.
- Decide whether to go ahead. If there's an amount for you to pay, the work is planned once BT receives payment.
- Use the 30-day change-of-mind period if you need it. BT says you have 30 days after paying to change your mind; after that the payment is non-refundable except as set out in its USO terms and conditions. Read those terms before you pay.
- Wait for the build (see timescales below).
How long the build can take
BT lists the kinds of things that cause delays: getting permission for road closures, physical obstacles, archaeology and protected wildlife. It says it will tell you early on how long it expects your build to take, and let you know if it will take longer than 24 months or can't be completed. When the USO launched in 2020, ISPreview reported Ofcom's delivery rules as BT connecting at least 80% of orders within 12 months, 95% within 18 months and 99% within 24 months of a confirmed order, with KCOM required to connect within 12 months save in exceptional circumstances. Treat those as the launch-era targets; we couldn't confirm they're unchanged.
What to ask the help desk
- Is my address eligible, and if not, which alternative service did you find that meets the USO standard?
- Is the estimated cost under or over £3,400?
- Are other eligible premises nearby being included in the same build, and how would that affect my share of any excess?
- How long do you expect the build to take, and will you tell me if it will run past 24 months?
- Where can I read the USO terms and conditions before I pay anything?
The £3,400 limit and paying excess costs
The law covers connections that cost no more than £3,400 per premises, or connections that cost more where the person asking pays everything above that figure. BT states the threshold as £3,400 excluding VAT. When the government set the design in 2018, it said the threshold would allow coverage of around 99.8% of premises.
What pushes a cost up is mostly civil engineering. BT names digging roads, overhead cabling, tree trimming and distance from the exchange. It also looks at how new network could reach other eligible properties nearby, which is where cost sharing comes in.
How BT shares excess costs
BT says that, after discussions with Ofcom, excess costs are shared between the eligible premises in the build area:
- If the excess works out at below £5,000 per premises, you pay only your share, and other eligible premises that join pay the same.
- If the excess is higher than that, you would need to raise the entire excess yourself or crowdfund it. BT's USO page refers to the Spacehive platform for crowdfunding.
KCOM takes a similar approach: it groups together local demand to bring more connections under the threshold, and says customers over the threshold can either pay the excess or do some of the work themselves.
Example (hypothetical): three households along the same lane all request the USO. BT's survey finds that one route would reach all three. If the cost above the threshold, split between the three, comes to less than £5,000 each, each household pays only its share. If the same route served only one house, that household could face the whole excess alone. So talk to neighbours before you call.
Be prepared for the possibility of a large figure. ISPreview reported in April 2026 that excess costs in some areas could run to hundreds of thousands of pounds, even £1-2 million, making the USO unviable there. If your quote comes back like that, the alternatives below are usually the realistic next step.
Fixed line, 4G hub or satellite: what you might be offered
Because the USO is technology neutral, the outcome of a request isn't always a new cable.
- A 4G or 5G home broadband service. ISPreview reports that many people who apply to BT are offered 4G (or 5G) via EE instead. If you're offered this, check the data allowance and price, and see our guide on whether 4G or 5G can replace fixed broadband. You can also see what EE sells to the public on our EE broadband deals page.
- A full fibre build. Where a connection is counted as delivered under the USO, it has usually been full fibre (fibre to the premises, often called FTTP). BT's April 2026 report, covered by ISPreview, said its USO builds had used FTTP.
- A "no" because satellite qualifies. When the USO launched in 2020, ISPreview reported that the 200ms latency requirement ruled out satellite. That's no longer the position. In July 2026 Ofcom confirmed to ISPreview that Starlink meets the criteria, and BT only has to build where no qualifying alternative exists; ISPreview reports some applicants had already been turned down because Starlink was available. Our guide to satellite broadband in the UK explains how it works.
When Starlink might not count
ISPreview points to cases where Starlink may not be a qualifying alternative: if you can't get a clear view of the sky or can't put a dish up, if pricing changes, or if your location attracts a congestion charge that could take it above the affordability threshold. In those cases, it says, you can still approach BT for a USO connection. If you're refused because of Starlink, ask BT why it thinks Starlink works at your exact address, and say so if it doesn't.
How many homes still can't get decent broadband
- Ofcom's Connected Nations 2025 report put 44,000 premises in the USO gap when fixed wireless and 4G/5G are counted, or around 340,000 (1%) if you look at fixed lines alone. Ofcom predicted the first figure would fall to 36,000 by the end of 2026 (as reported by ISPreview).
- Ofcom's Spring 2026 data, to January 2026, put the figure at 39,000 premises (0.1%) when 4G, 5G and fixed wireless are included, down from 44,000 (ISPreview, May 2026). ISPreview's July 2026 report gave the split as 23,000 in England, 9,000 in Scotland, 6,000 in Wales and 1,500 in Northern Ireland.
- Consumer Scotland's Connected Consumers report, covered by ISPreview on 30 September 2026, says 51,211 premises in Scotland can't access USO-level speeds, 43,602 of them rural. That's a different measure from Ofcom's headline count above.
- BT's April 2026 report said it had connected over 9,089 premises under the USO (up from 8,553 in October 2025), with 461 builds in progress.
The gap between "fixed lines only" and "including wireless" matters if you're thinking of applying. Ofcom's figures suggest most premises that can't get 10Mbps down a wire do have a wireless option that meets the standard, and because the USO is technology neutral, that option can count against you. These figures come from ISPreview's reporting of Ofcom data and from the reports named.
Is the USO changing?
Not yet. When it set the design in 2018, the government said the 10Mbps minimum would be kept under review and was expected to rise over time. The Digital Economy Act 2017 links a review of the speed to the point when at least 75% of UK premises subscribe to a service of 30Mbps or more.
The Department for Science, Innovation and Technology (DSIT) ran a consultation on reviewing the USO from 2 October to 27 November 2023. Because of the 2024 change of government, DSIT says it doesn't expect to publish a response, and any changes would need a further consultation. ISPreview described the review as appearing to have stalled.
Pressure is building. Consumer Scotland's Connected Consumers report, covered by ISPreview on 30 September 2026, calls for an urgent review of the 10Mbps USO that starts promptly in 2026 and commits to raising the USO speed to at least superfast level. For now, the rules in this guide still apply (checked October 2026).
If the USO isn't right for you
If you're not eligible, the quote is out of reach or you simply want something faster than 10Mbps, there are other routes:
- Openreach Fibre Community Partnership. This is separate from the USO. Openreach builds full fibre to communities outside its plans, funded by government gigabit vouchers (Openreach says eligible properties can get up to £4,500, checked October 2026), by the community or both. Openreach contracts with a legal entity representing the community (one may need to be set up, for a small charge), and once the build starts it typically takes 12-18 months.
- Project Gigabit. The UK government's gigabit broadband programme, which BT points to as an alternative. Our guide to Project Gigabit explains how it works.
- Scotland and Northern Ireland. BT points to R100 and Project Stratum. The Scottish Government says the R100 contract build is expected to finish in 2028, and its broadband address checker shows what's planned for your address. Project Stratum in Northern Ireland finished in June 2025; the Department for the Economy directs people to HyperfastNI to see whether it reached them. Our guide to broadband rollout in Scotland and Northern Ireland covers what's still running.
- Wireless and satellite options you can buy now. Our rural broadband options guide compares 4G/5G home broadband, fixed wireless and satellite for homes where the phone line is the weak link.
- Getting the most from a long copper line. Our guide to slow broadband on long lines covers what can and can't be improved.
The comparison on our broadband deals by area page shows live deals for your postcode through our comparison partner, and our broadband providers hub lists the networks and providers we cover, including smaller rural networks. We don't switch you or arrange USO requests ourselves; those go directly to BT or KCOM.
If something goes wrong: complaints
If you're unhappy with how BT has handled your USO request, raise a complaint through the universal service help desk on 0800 783 0223. If it isn't resolved within eight weeks, you can refer it to Ombudsman Services, which is free for you to use. KCOM handles USO complaints under its Complaints Code of Practice.
Keep a record of your request date, reference number, speed tests, the decision and any quote or refusal reason. Our guide on how to complain about a broadband provider covers the escalation route in more detail.
Broadband USO FAQs
What speed does the broadband USO guarantee?
The USO sets a minimum standard rather than a guaranteed speed test result: a download sync speed of at least 10Mbps and an upload sync speed of at least 1Mbps. The connection must also have a contention ratio no higher than 50:1, latency good enough for voice calls and at least 100GB of data a month.
Who can request a USO connection?
Anyone at a fixed home or business address where no decent, affordable connection is available and none is coming through a publicly funded scheme within a year. You don't need to be a BT or KCOM customer. BT also says you won't qualify if you can get a connection through a 4G hub, and Ofcom has confirmed that Starlink can count as a qualifying alternative.
How much will a USO connection cost me?
The build is covered up to £3,400 per premises (excluding VAT, according to BT). Above that, you pay the excess or the request doesn't go ahead. BT shares excess costs between eligible premises in the build area, but if the excess is over £5,000 per premises you'd need to fund all of it or crowdfund.
How long does it take to get connected under the USO?
BT says the eligibility check can take about 30 days and a full survey and quote, if needed, about 60 days. BT aims to complete builds within 12 months, possibly up to 24 months, and longer in exceptional cases such as road-closure permits, archaeology or protected wildlife.
Can BT offer me 4G or Starlink instead of a fixed line?
Yes. The USO is technology neutral, and BT only has to build a connection where no qualifying alternative exists. ISPreview reports that many applicants are offered 4G via EE, and Ofcom confirmed in July 2026 that Starlink meets the criteria, although it may not qualify where there's no clear view of the sky or the price is too high.
Is the 10Mbps USO going to be increased?
Not at the moment. The government consulted on reviewing the USO in late 2023 but says it doesn't expect to publish a response because of the 2024 change of government, and any changes would need a further consultation. Consumer Scotland's Connected Consumers report, covered by ISPreview in September 2026, called for an urgent review and a rise to at least superfast speeds.



