The short answer
A full fibre installation brings a new fibre-optic cable from the street to your home, fixes a small box to an outside wall, takes the fibre through a small hole in the wall and finishes at a box inside called the ONT (optical network terminal, the point where the fibre ends and your router plugs in). The engineer then connects your router and tests the line.
On Openreach's network, which providers such as Vodafone and Rebel sell full fibre over, most installations take between one and four hours, so keep the whole morning or afternoon free. Other networks' own figures are in the table below.
An adult over 18 who can make decisions, such as where the cable comes in and where the equipment goes, needs to be home throughout. Most of this guide is about making those decisions in advance.
Who actually does the installation
The company you pay each month isn't always the one that sends the engineer. Many providers sell full fibre over someone else's network, whose engineers do the work:
- Openreach installs full fibre for providers that use its network. It says it has no access to your order details, so the appointment belongs to your provider (see what Openreach is).
- CityFibre installs for the providers that sell over its network (it says more than 30). Your provider gives you the slot and handles changes.
- Altnets (independent networks such as Gigaclear, Truespeed, Hyperoptic, Community Fibre or Quickline) build their own networks (see what an altnet is). If you buy from one directly, the provider and the network are the same company, so you book and change the visit with them.
So if you've chosen, say, a Vodafone full fibre deal, the engineer may come from Openreach, CityFibre or Community Fibre depending on which network serves your street, because Vodafone sells over all three. Choose Quickline in Yorkshire or Lincolnshire and the engineer comes from Quickline, which builds and runs its own network.
Either way, to change or cancel an appointment, contact the company you're paying.
Before the day: surveys and outside work
Not every installation is a single visit. Depending on the network and your property, some of the work may happen beforehand, sometimes without you being home.
Openreach pre-visits and video surveys
Before some installations, Openreach sends an engineer on a pre-visit to check the network is ready. That might mean inspecting nearby underground cables or checking a telegraph pole can take a new fibre line. You usually don't need to be in, unless access is needed (for example behind a locked gate). If the engineer couldn't get in, they leave a 'Sorry we missed you' card: follow its instructions to avoid delays. Openreach says your installation date is confirmed after the pre-visit checks, in most cases a few days later.
Openreach may also survey first if access is unusual, or do some outside work before the date. You might get a text from VYN, an Openreach partner, inviting you to do a short video survey on your phone so Openreach can see what's needed, such as digging or drilling. Openreach says these texts are genuine if you have an appointment booked.
Networks that run the cable to your wall first
Some altnets do the outside work on an earlier visit:
- Gigaclear brings fibre overhead from a pole, through existing ducts or buried from a boundary point, without you needing to be home, and leaves a coil of fibre at your outside wall. If you'd rather that didn't happen without you, it says a chargeable survey may be needed.
- Truespeed sends someone a week or two before installation to check for things like overhanging trees or blocked ducts, choose the route, do outside work and leave a coil of fibre. You needn't be home.
- Quickline says a survey usually comes first and, for fibre customers, is normally done as it passes the property. Where it connects you overhead, it says it typically follows any existing external route and uses the existing bracket on your home.
If a coil of cable appears on your wall before the appointment, that's usually why: leave it where it is.
How to prepare: a checklist
Work through this list once your date is booked:
- Make sure an adult can be home throughout. Openreach asks for a 'decision maker' over the age of 18 for the whole appointment. CityFibre, Vodafone and Gigaclear also ask for someone over 18, and Hyperoptic for someone aged 18 or over.
- Sort permissions now, not on the doorstep. Openreach says renters need landlord permission for any drilling inside or outside. For a shared driveway, rented or listed building, Vodafone says to get permission first and you'll sign a wayleave agreement (permission for the network's equipment on the property). Our guide to broadband wayleaves explains when these are needed, and our guide to broadband for renters covers asking a landlord.
- Decide where the router goes and check for free sockets there (next section). CityFibre asks for two free plug sockets, more for a cordless phone (extension cables are fine); Gigaclear asks for two, plus two more with its home phone service.
- Clear the way outside and in. The engineer needs to reach the outside wall and the indoor spot. Openreach says to tell your provider beforehand about anything that could prevent the engineer connecting you on the day.
- Don't cancel your current broadband yet (see below).
- Look out for your router. Vodafone, for example, says equipment arrives three days before the confirmed date, and Openreach may text to remind you to plug your router in.
Choosing where the router and ONT go
The fibre ends at the ONT, and your provider's router connects to it with a short cable, so the router and ONT need to be close together. In practice, wherever the ONT goes is where your Wi-Fi starts.
Openreach suggests choosing a spot near a double power socket that suits Wi-Fi coverage, and not a dark cupboard under the stairs. If you want to plug a TV or computer in by cable, think about how that cable would reach it.
Some networks give a rough idea of distances. Truespeed says the hole can be within ten metres of where it left the cable on its earlier visit, and Community Fibre says the ONT and router are typically within 10 metres of the entry point, usually on the ground floor. If you want them further in or upstairs, ask your provider beforehand whether that still counts as a standard installation.
Our guide to the ONT and your router explains what the box does and what happens to your landline phone, and our Wi-Fi signal tips help with far rooms.
Alarms, pendants and anything else on your phone line
If your phone line carries an intruder alarm, a health pendant or a wrist alarm, Openreach says to contact your provider before the installation. Vodafone advises checking with the device's manufacturer or provider that personal and care alarms will work with the fibre connection. Our guide to telecare alarms and the digital landline covers the questions to ask.
On the day, step by step
Details vary by network, but an Openreach installation runs roughly like this:
- A call or text before arrival. The engineer gets in touch to check you're in, ask about access or parking, and give a rough arrival time within your provider's slot. Elsewhere, CityFibre's arrival windows are 08:00-13:00 or 13:00-18:00 with reminder, on-the-way and arrived texts; Gigaclear's engineer arrives between 8am and 6pm; Truespeed texts two days before and on the day.
- Agreeing the route. The engineer talks you through how the fibre will reach your home, either overhead from a nearby telegraph pole or underground through a duct (a buried pipe that carries cables), and agrees where a small hole will be drilled to bring it inside. CityFibre's engineers also discuss the route with you.
- Permission to dig or drill. If digging or drilling is needed, Openreach's engineer asks you to sign a permission to work form first. Vodafone says that in some cases engineers need to dig a route through a garden or driveway and will always talk to you before doing so.
- Outside work. The fibre is run to a small junction box fixed to an outside wall. Openreach engineers may drill a couple of small holes for ladder safety; these are filled afterwards and the area left tidy.
- Bringing the fibre inside. A small hole is drilled through the wall to connect the outside box to the ONT inside: 12mm for Openreach, while Community Fibre says 6-8mm.
- ONT, router and testing. The ONT is fixed inside, your router plugs into it, and the engineer tests the line, connects your main device to the router and checks everything works.
Others finish similarly: Hyperoptic's engineer sets up the router and tests the connection, Gigaclear activates the service and confirms your speed, and Quickline's engineer sets the router up on the day.
Making sure the engineer and messages are genuine
Openreach advises checking the engineer's ID badge before letting them in; some new engineers drive plain white vans. It says it will never ask for your bank details.
Openreach also publishes the numbers its texts come from. When we checked in October 2026, these included 07701407770 for installing a new service, 07491163160 for full fibre activation and 07860041025 (or 07491163160) for appointment updates, with emails sent from info@comms.openreach.co.uk. If a message looks odd, check Openreach's engineer appointments page or call your provider on a number you already know. Our guide to broadband scam calls and emails covers the common tricks.
How long the visit takes
Here's what each network or provider says about the length of a standard installation visit (checked October 2026). These are the companies' own descriptions, not guarantees, and complex jobs can take longer.
Network or provider | What it says about visit length |
|---|---|
Openreach | Most installs take one to four hours; its installation-day checklist says usually around four hours |
Vodafone (full fibre) | Can take up to four hours |
CityFibre | Usually 2-3 hours from arrival; some flats may be quicker |
Hyperoptic | Most appointments take one to three hours |
Gigaclear | Around 2 hours |
Community Fibre | Usually up to two hours (its router help page says typically 90 minutes) |
Connect Fibre | Usually 1-2 hours |
Ogi | Up to 1.5 hours |
Voneus | 1 to 1.5 hours |
Truespeed | Usually under an hour (outside work is done on a separate, earlier visit) |
Don't confuse the arrival window with the visit length, which starts when the engineer arrives: CityFibre's 2-3 hours count from arrival. Hyperoptic also says some properties already have its equipment installed and may only need remote activation.
Why some installs take longer or need a second visit
Openreach lists the most common reasons a full fibre installation is delayed:
- Digging or clearing underground ducts, either a soft dig with hand tools on grass or a hard dig by specialist civil engineering teams.
- Cutting back trees in the way of an overhead route.
- Scaffolding, where the work is higher than a ladder can safely reach.
- Road closures.
- Clearing water or debris from underground chambers or ducts.
- Needing a specialist engineer.
- Waiting for permissions from councils or property owners, including wayleaves.
In a small number of cases, Openreach says the work is complex enough that a follow-up appointment on another day is needed. If so, ask the engineer what happens next and confirm the new date with your provider. For the wait between ordering and going live, see our guide to broadband installation lead times.
What gets fitted in your home
For an Openreach installation, Openreach's guidance for landlords gives the sizes:
Item | Where | Size (Openreach) |
|---|---|---|
External junction box | Outside wall, where the fibre arrives | 15cm x 13cm |
Hole through the wall | Between the outside box and the ONT | 12mm |
ONT | Inside, fixed to the wall | Around 13cm x 11cm |
Router | Next to the ONT | Supplied by your provider |
Other networks use similar kit: Gigaclear fits a wall box outside and another inside.
- It isn't yours. CityFibre says all the equipment it installs on your land remains its property. Ask your provider if something needs moving, rather than doing it yourself.
- It's meant to be a one-off. Openreach describes a full fibre installation as the one and only installation you'll need: if you upgrade to a faster speed later, you shouldn't need another.
- Damage is the network's to put right. Openreach's landlord guidance says its engineers work carefully to avoid damage and it will cover the cost of repairs if any occurs. Point out anything you're unhappy with before the engineer leaves.
Costs, standard and non-standard installs
Whether you pay for installation depends on your provider and package, not the network. CityFibre says your provider confirms any charges before the appointment, and Hyperoptic says charges are confirmed before you complete your order. Quickline said in May 2026 that fibre installation was currently free for residential customers, while Vodafone says an installation fee may apply. Openreach's landlord guidance calls installation free, but that's written for property owners: check the installation line in your provider's order and contract summary.
The catch is the word standard. Several networks say unusual jobs may need a survey and, sometimes, a contribution from you:
- Gigaclear names listed properties, long distances from the boundary and surfaces such as block paving, concrete or tarmac as triggers for a survey, with a customer contribution in a small number of cases.
- Truespeed says going beyond a standard installation isn't always possible if it wasn't arranged in advance, and may cost extra.
- Zzoomm surveys jobs expected to take more than four hours.
- Trooli says properties classed as 'Non Duct Lead In' need an external survey and may have to pay a fee agreed in advance.
If your home has a long drive, hard paving, listed status or anything unusual, mention it when you order and ask whether a survey or charge could apply. Charges for a later visit to fix a fault are a separate matter, covered in our guide to broadband engineer visit charges.
If the engineer doesn't turn up or the service starts late
Many large providers have signed up to Ofcom's voluntary automatic compensation scheme. As reported by ISPreview, from April 2026 signatories pay £32.31 for a missed engineer appointment and £6.46 per day when a new service doesn't start on the agreed date (these amounts rise each April). Not every provider is a signatory, so check your provider's terms. Our guide to automatic compensation for broadband problems explains how it works and what doesn't count.
Keeping your current broadband until the new one works
CityFibre says your current service keeps working until you cancel it, with possibly a short pause while you set up a new router. Gigaclear recommends not cancelling your old provider until your new service is installed and activated, unless you're using One Touch Switch. That's Ofcom's switching process, in use since 12 September 2024: you contact only the new provider, your current provider then sends you important information about the switch, including what leaving your current deal would cost, and the new provider arranges the switch with your old provider for the date you choose, whichever networks the two use.
If you're switching this way, you don't cancel the old service yourself. If you're not, wait until the new connection works before giving notice. Our guide to switching broadband providers walks through both routes, and our guide to cancelling broadband covers notice periods and final bills.
After the engineer leaves
Before the engineer goes, ask:
- Which box is the ONT, and which lights should be on when it's working?
- Has the line been tested, and is the service fully active now or later today?
- If a return visit or outside work is still needed, who arranges it and when?
- If you have a landline service, how does the phone connect now?
Once they've gone, run a speed test on a device connected by cable to the router, or close to it on Wi-Fi, using our broadband speed test. One test is a snapshot, so try a few at different times.
If you haven't ordered yet, the comparison on our fibre broadband deals page shows the full fibre deals available at your postcode from our comparison partner, and each provider's own terms say whether installation is charged. If the property has never had a line at all, read our guide to getting broadband at an address with no line first, as it explains what's different when there's nothing to connect to yet. Our broadband deals by area pages show who covers where you live.
Full fibre installation FAQs
How long does a full fibre installation take?
It depends on the network and your property. Openreach says most installations take between one and four hours, and its installation-day checklist says to expect around four. Other networks quote their own figures (checked October 2026), such as CityFibre usually 2-3 hours from arrival and Gigaclear around two hours. Complex jobs can take longer.
Do I need to be at home for a full fibre installation?
Yes. Openreach, CityFibre, Gigaclear and Vodafone all ask for someone over 18 to be home (Hyperoptic says 18 or over), and Openreach wants that 'decision maker' there for the whole appointment, because the engineer needs agreement on the cable route, drilling and where equipment goes. Earlier outside-work visits, such as Openreach pre-visits or Gigaclear and Truespeed external work, usually don't need you there.
Will the engineer drill holes in my house?
Usually, yes, but small ones. Openreach drills a 12mm hole through the wall to bring the fibre from the outside box to the ONT inside, and Community Fibre says it drills a 6-8mm hole. Openreach asks you to sign a permission to work form before any drilling or digging, and renters need their landlord's permission first.
Will my current broadband stop working during the installation?
It shouldn't, as long as you haven't cancelled it. CityFibre says your existing service keeps working until you cancel, perhaps with a short pause while you set up the new router. Gigaclear recommends keeping your old provider until the new service is activated, unless you're using One Touch Switch.
What happens if the engineer can't finish the installation?
Sometimes the job needs another visit, for example for digging, clearing blocked ducts, scaffolding or waiting for permissions such as wayleaves, which Openreach lists among common causes of delay. Ask the engineer what happens next, then confirm the new date with your provider. If your provider is in Ofcom's automatic compensation scheme, a late start may qualify for payments.
Who do I contact to change my installation appointment?
The company you pay for broadband. Openreach says it can't see your order details and the provider manages the appointment, and CityFibre says your provider handles changes and cancellations. If you buy directly from a network such as Gigaclear, Truespeed or Quickline, the provider and the network are the same company anyway.



