Why the street can have full fibre but your flat can't
Houses down the road may have full fibre while your flat can only order an older, slower service. Full fibre (also called FTTP, fibre to the premises) means a fibre-optic cable runs all the way into your home. For a flat, that cable has to pass through parts of the building no single resident owns: the entrance, corridors, stairwells and riser cupboards (the shafts that carry cables and pipes between floors).
Those shared parts belong to the freeholder and are often run by a managing agent. Openreach says that before it installs in a block of flats it needs a wayleave from the freeholder or managing agent. A wayleave is a written legal agreement in which the owner of a building or land lets a network install, maintain and repair its equipment there. See our guide to broadband wayleaves and access rights for the general picture.
So "fibre in the street" and "fibre in your flat" are separate steps. The first needs a network to build past the building. The second needs someone with authority over the building to say yes, followed by a survey, an agreed route and a build inside.
Silence is the usual problem, not refusal
In its December 2022 guidance on the rules for flats, the government said data from several operators suggested around 40% of their requests for access got no response. When that happens, an operator typically bypasses the building, leaving residents on an old copper line while the street is upgraded. Because the problem the government highlighted was silence rather than refusal, the most useful things residents can do are practical: find out who controls the building, make sure the request reaches them at a current address and keep it moving.
Check what your building can actually get
First, check your exact flat, not just the postcode, with more than one network. A block can show differently from the houses around it, and several networks may serve or plan to serve the same building. Our guide on how to check whether full fibre is available explains the different checkers and why they sometimes disagree. Remember to check altnets too: an altnet is an alternative network, a company other than Openreach and Virgin Media that builds its own cables (see what an altnet is).
The GOV.UK gigabit checker covers England and Wales only, and GOV.UK says it can't guarantee complete accuracy. For Scotland, GOV.UK points to the Scottish Government's own broadband checker; for Northern Ireland, to the Department for the Economy's Project Gigabit page. The surest sign you can buy full fibre today is a provider offering it for your full address, flat number included. The comparison on our fibre broadband deals page shows the deals our partner's tool lists for your postcode; because a block can differ from the street, confirm your exact flat with the provider before ordering.
Who has to say yes
The government's guidance calls the person whose agreement is needed the required grantor, and says it could be a landlord or a property management company. In practice it's whoever owns or controls the shared parts the cable has to cross: the freeholder (a person, company, housing association or council), a managing agent acting for them, or a resident management company or right to manage (RTM) company run by the flat owners.
Networks expect to deal with all of these. CityFibre's building enquiry form offers options for managing agents and factors, housing associations, freeholders, and a combined residents' association/RTM option. Hyperoptic's registration form for existing buildings accepts freeholders, leaseholders, property managers, resident management companies, residents' associations and tenants.
GOV.UK's guidance on access agreements says later owners of the land are bound by code rights already agreed, so a change of freeholder doesn't undo a signed agreement.
If you rent your flat
Your landlord may not control the building. If you rent from someone who owns one flat on a long lease, they own the flat, but the corridors and risers belong to the freeholder. You may need both: your landlord's agreement for work inside the flat, and the freeholder's or managing agent's agreement for the building route. Openreach's installation checklist says renters need their landlord's permission for any drilling, inside or out. Our guide to broadband for renters covers the rest.
If you own your flat on a lease
Owning your flat doesn't let you approve cables through the shared parts, so the freeholder or managing agent still has to sign. Leases differ on work inside the flat itself, so check yours or ask your managing agent before booking anything that involves drilling.
Finding out who owns or manages your building
A network can't get a yes from someone it can't reach, so a correct name and address is often the most useful thing you can provide. In England and Wales:
- Rent and service charge demands. Under the Landlord and Tenant Act 1987, written demands for rent or service charges on a home must include the landlord's name and address. Leaseholders' service charge demands are a good place to start.
- Ask in writing. Under the Landlord and Tenant Act 1985, a tenant can make a written request for the landlord's name and address to whoever collects the rent or acts as the landlord's agent, who must reply in writing within 21 days. This gives your immediate landlord, who may be the flat owner rather than the freeholder.
- HM Land Registry. GOV.UK's Land Registry search lets anyone look up a property in England or Wales, and a title register usually shows who owns it. Scotland and Northern Ireland have separate registers. Operators must check the Land Registry title before using the court route described below.
Note the freeholder's and managing agent's names, emails and postal addresses to pass to every network.
How Openreach wires a block of flats
Openreach runs the network that many UK providers sell over. Its help pages set out the process for blocks of flats (checked October 2026):
- Residents pass on the landlord's details through Openreach's online form and tell the landlord, freeholder or managing agent they want Full Fibre. Openreach says this helps speed things up.
- Wayleave and asbestos information. The wayleave is emailed to the freeholder or managing agent as a digital agreement. For buildings built before 2000, Openreach needs the asbestos register; for later buildings, written confirmation of no known asbestos. It holds the survey and order until it has this.
- Survey and route approval. A confirmation of the route must be signed before work starts.
- Build in the communal areas. Openreach or a partner needs access to common areas inside and outside; it says no access to individual flats is needed at this stage.
- Residents order from a provider, who arranges the installation inside each flat.
Also from Openreach:
- No minimum number of residents. It can install however many residents are interested, and only those who choose to connect need to.
- Usually free. Once all permissions are in place there's usually no charge to install to the building, though specialist or non-standard work may be charged. Provision is at Openreach's discretion.
- It takes months. After the wayleave is signed, survey to completion can take several months for a block, depending on the building, permissions and engineering needed.
- No obligation. Residents don't have to use the fibre, won't lose existing services and aren't locked into one supplier. Openreach says its network is open to all providers; our broadband providers hub links to each provider's page.
Other networks that may wire your block
Openreach isn't the only option. Some networks specialise in blocks of flats; others build across whole areas but still need a wayleave for each block, just as Openreach does. One of them may connect your building even if Openreach hasn't, so register with every one that covers your area.
Network | How it works for flats (checked October 2026) |
|---|---|
Builds its own fibre into buildings, mostly flats and new-builds in high-density urban areas. Check your address and register interest if your building isn't connected; registering doesn't guarantee service. It describes installation in existing buildings as cost-neutral for the building and tenants. | |
Builds its own fibre inside apartment blocks, working with landlords and developers, and says it's the UK's only provider 100% focused on apartment residents (its own claim). It installs once enough interest is registered, but gives no date for unlisted buildings and can't guarantee it will install soon. | |
Builds and runs its own full fibre network, mostly in London; it began with pilot builds in Westminster social housing. Check by address on its website. | |
CityFibre | Asks the owner or their agent to sign a wayleave, then surveys and installs into the building free once the route is approved; residents then order from a range of providers. It tells residents to speak to their managing agent and doesn't survey individual flats. |
The brand you buy from isn't always the network in your building. Rise Fibre, for example, comes from the same company as 4th Utility and sells over several networks, including Openreach, CityFibre and 4th Utility's own fibre in some blocks of flats. Once your block is wired, check which providers sell over that network.
A step-by-step plan for residents
You can't sign a wayleave yourself, but you can do much of the legwork.
- Check every network for your exact flat and note what each says: available, planned, register interest or nothing.
- Identify the freeholder and managing agent using the sources above.
- Register with each network (Openreach's resident form and each altnet's interest form) and give them those contact details.
- Write to the managing agent or freeholder by email, and by post if there's no reply. Keep copies.
- Get neighbours involved. Ask them to register too: 4th Utility, for example, says it starts installing once enough interest is registered. If your block has a residents' association or RTM company, ask it to raise the request with the managing agent on behalf of the block.
- Raise asbestos early. In an older building, ask whether the asbestos register is ready to share, since Openreach won't survey without it.
- Keep everything in writing, with dates. If the landlord never replies, the operator needs evidence that a resident asked for service.
What to put in your message
- Your flat number and that you'd like full fibre in the building.
- Which networks you've registered with, and that they'll contact the freeholder or agent about a wayleave.
- That Openreach and CityFibre say installation into the building is usually free, and Hyperoptic calls its installation cost-neutral, so the agent can check each network's terms.
- A request for a written reply saying who will deal with it and when.
If the freeholder never replies: Part 4A
The Telecommunications Infrastructure (Leasehold Property) Act 2021 added Part 4A to the Electronic Communications Code (the law giving network companies rights to put equipment on land). It came fully into force in England and Wales on 26 December 2022 and in Scotland on 1 July 2023, and gives operators a quicker court route into the shared parts of a block when a resident has asked for a service and the landlord keeps failing to respond.
Part 4A is for operators, not residents. Only companies Ofcom has applied the Code to can use it; the government's guidance gives EE and Virgin Media as examples. It applies only when:
- the building has two or more separate homes (a "multiple dwelling building");
- the flat is lived in under a lease and the occupier has asked the operator for a service. Government guidance gives assured shorthold and assured tenants, and tenants at will, as examples, so renters count;
- the operator needs rights over shared areas such as corridors, stairwells or riser cupboards; and
- the landlord hasn't responded to the operator's notices.
The notice timeline
Step | Timing |
|---|---|
Request notice | The operator formally asks for the rights it needs. |
First warning notice | At least 7 days after the request notice. |
Second warning notice | At least 7 days after the first warning. |
Final notice | Can only be given once at least 7 days have passed since the second warning and at least 28 days since the request notice, and no later than 28 days after the second warning. It gives the landlord 14 days to respond. |
Court application | Within 42 days of the final notice. |
Before the final notice, the operator must check the Land Registry title and ask the resident for the landlord's name and address; if new details turn up, it must re-send the warning notices. Reply quickly if a network asks for your landlord's details.
Why an acknowledgement stops it
Under the Act, the landlord "responds" if it agrees or refuses in writing, or simply acknowledges the notice in writing. Any of these takes the building out of Part 4A, so a one-line "received, thanks" can stop the court route even if nothing follows. That's why pressing the managing agent for an actual decision matters.
What a court order means
- A court can make a Part 4A order only if the requirements are met and the landlord hasn't objected.
- The rights last 18 months unless replaced sooner by an agreement (or a court refuses a replacement); after that the landlord can require the equipment's removal.
- They can serve other flats in the block only if that adds no extra burden on the landlord.
- The landlord can apply for compensation for loss or damage caused.
Under the 2022 regulations, the operator must give at least 5 working days' notice before entering, post the notice in the building for all residents, work only 08:30 to 18:00 Monday to Friday (except emergencies, or as agreed in writing with a managing agent or recognised tenants' association), restore the area and indemnify the landlord up to £5,000,000 before work starts.
The government's guidance doesn't say how often Part 4A has been used, so don't count on it as the answer for your block. Ask each network whether it uses Part 4A for unresponsive landlords.
If the landlord says no
A written refusal takes the building out of Part 4A, but the operator can still apply to court under the ordinary Code process. Its request notice already counts as the Code notice, so it doesn't have to start again: once the landlord refuses in writing it can apply straight away, and if there's no answer at all it can apply 28 days after its notice. Before applying it must consider alternative dispute resolution (such as mediation) where reasonably practicable. That's the operator's decision, and a court can impose an agreement only if any harm to the landowner can be properly compensated with money and the public benefit outweighs it.
Court is slow and entirely up to the operator, so it's worth trying to change the freeholder's mind first. It can help to ask why they refused and pass the reason to the network, which may be able to answer it. Try a different network, whose proposal may suit the building better, and involve your residents' association or RTM company.
Northern Ireland and other limits
The 2021 Act extends to all four nations, but Part 4A isn't in force in Northern Ireland. legislation.gov.uk records it as in force only for England and Wales and for Scotland, and the two sets of regulations that make it work extend only to those nations (checked October 2026). In a block in Northern Ireland, the ordinary Code process and persuading the landlord are what's left, so ask the network what it can do. The Landlord and Tenant Act rules on getting your landlord's details apply in England and Wales only.
Part 4A doesn't cover single houses or work inside your own flat.
Getting the best connection while you wait
Wiring a block can take months even when everyone agrees. If you sign up while waiting, think about contract length. A 30-day rolling contract leaves you free to move when full fibre arrives, but usually costs more: Rise Fibre, for example, says its 30-day plans come with higher prices and more frequent price reviews. Whichever you choose, check the end date and any early exit charges in the contract summary. For some flats, 4G or 5G home broadband is a stopgap; see whether 4G or 5G can replace fixed broadband.
When fibre reaches the building, you book the in-flat installation through your chosen provider; our guide to full fibre installation day explains what happens. To see which providers are selling in your area now, enter your postcode in the comparison on our broadband deals page. It's run by our partner and shows live deals listed for your postcode; confirm with the provider that your exact flat can be connected before ordering. We don't arrange the switch or the wayleave.
Full fibre in flats FAQs
Why does the checker show full fibre in my street but not in my flat?
Fibre reaching the street doesn't mean it reaches your building. To serve flats, the network has to run cables through shared areas owned by the freeholder, so it needs a written wayleave from the freeholder or managing agent, then a survey and an internal build. Until then, flats can be left on the older line.
Do I need my landlord's permission to get full fibre in a flat?
For the building, yes: the freeholder or managing agent must agree to cables in the shared parts, usually by signing a wayleave. If you rent, Openreach says you also need your own landlord's permission for any drilling. Leaseholders should check their lease or ask the managing agent before work inside the flat.
Does it cost anything to get full fibre installed in a block of flats?
Openreach says installation to the building is usually free once permissions are in place, though specialist or non-standard work may be charged. CityFibre says its survey and installation are free, and Hyperoptic calls its installation for existing buildings cost-neutral. Your own provider's set-up terms for the flat are separate, so check them before ordering.
How many residents need to sign up before Openreach will wire the building?
There is no minimum. Openreach says it can install however many residents are interested, and only those who choose to connect need to. Some building-by-building networks differ: 4th Utility says it starts installing once enough interest is registered, so getting neighbours to register can help there.
Can I use Part 4A myself to make my freeholder allow fibre?
No. Part 4A is a court route for network operators that Ofcom has applied the Electronic Communications Code to, not for residents. Your part is asking the operator for a service and helping it find the landlord. If the landlord ignores four notices over the set timescales, the operator may apply to court, but that's its choice.
If Openreach fibre is installed in my building, do I have to switch provider?
No. Openreach says residents don't have to use the fibre once it's installed, won't lose existing services and aren't locked into one supplier. Its network is open to many providers, so when you're ready you choose one selling full fibre on it, and that provider arranges the installation inside your flat.