What happens at a Gigaclear installation (2026)

What happens at a Gigaclear installation

The short answer

Gigaclear is a rural England network operator that also sells broadband directly; its connections are full fibre, meaning fibre-optic cable runs right into your home with no copper phone line in the path. For most customers, it says, installation happens in two stages: engineers do the outside work first and leave a coil of fibre cable at your wall, without needing you at home; then, on your booked date, an engineer fits the equipment, sets up your Wi-Fi and switches the service on.

You can book that date between 14 and 90 days after ordering, and Gigaclear says dates are typically available within around three weeks (checked October 2026). The engineer arrives between 8am and 6pm and the visit takes around two hours; someone over 18 who can make decisions for you must be there throughout. Homes already connected self-install instead.

For full fibre installs generally, see what to expect from a full fibre installation; for packages, see our Gigaclear broadband deals page.

Before you can order: is your connection point ready?

You can't order until the network build has reached your area and the connection point outside your home, which Gigaclear calls a POT (point of termination), is ready. Gigaclear contacts residents when it is.

During the build Gigaclear can't give dates for individual connection points; it says a rural community of 200 to 400 properties usually takes six to nine months from design validation to completion. Homes just outside the network may be added case by case, possibly with a financial contribution. Our guide to what to do when full fibre isn't in your street covers the other routes.

Ordering through a different provider on Gigaclear's network

Gigaclear's network is open access. In October 2026 it listed Merula, Village Networks, Wurzel, Gigabit IQ and VeloxServ as home broadband partners; the list changes (in August 2026 ISPreview reported that Squirrel Internet had stopped taking new customers on it, and understood Exascale had also ended its partnership). Order from a partner and your contract is with that company, which tells you about installation, costs and timescales, so this guide may not apply. See independent fibre networks explained.

To see what else is on offer where you live, browse broadband deals by area or a county page such as broadband in Oxfordshire or broadband in Gloucestershire.

Booking your installation date

Gigaclear gives you three ways to pick a date:

  • At checkout, online or by phone.
  • From an email: the link in your order confirmation or in the follow-up email sent the day after you order.
  • In the customer portal on Gigaclear's website.

The date must fall between 14 and 90 days after you order, so allow two weeks at least. Example (hypothetical): order on 1 November and the earliest date you could book is 15 November. If your current contract ends on a particular day, work back from the date you need.

If you're switching with One Touch Switch (see below) and the date changes, Gigaclear says it tells your current provider the new date automatically.

The Gigabit Broadband Voucher request

Where a home is eligible for a Gigabit Broadband Voucher (government funding towards fibre for hard-to-reach homes), Gigaclear asks your consent to claim it from BDUK, the government's broadband delivery body, and waives the activation fee if you consent and answer BDUK's emails. GOV.UK says the scheme closed to new projects on 31 August 2026, so only homes in existing voucher projects qualify. See Project Gigabit and rural fibre funding.

The video survey text from 'Vyn'

After you book, Gigaclear may text you a link from "Vyn", which is Vyntelligence, its remote survey partner. It asks for a short phone video of your property, with nothing to download. It's optional: without one, installation goes ahead as planned.

If you do it, Gigaclear asks for the video within 24 hours, so it can be reviewed before the outside work, and recommends 30 to 60 seconds. It helps the team spot access issues and bring the right equipment. Its software blurs faces, but Gigaclear asks you not to film people or anything that could identify someone. The video doesn't decide the route, and Gigaclear only contacts you afterwards if it spots something that might delay your installation. Unsure a text is genuine? Our suggestion: don't tap the link; ring Customer Services on 01865 591 131 and ask.

Stage one: the outside work

Before your booked date, Gigaclear's engineers complete the external works and leave a coil of fibre cable at your outside wall. You don't need to be in; if you are, they knock. Ordering authorises this work under Gigaclear's terms, which don't say how far ahead of your date it happens, so ask when you book if you want to be around. Three things to know:

  • It can be intrusive. Depending on how your home is connected, there may be digging. Gigaclear says it looks for the least disruptive route; if you want a say in the route, you may have to pay for a survey first; ask the Customer Enablement team (03708 637 608) before the work is due.
  • Where the cable is left matters. Engineers pick the most efficient route. Gigaclear's terms say that if you then want the outside wall box more than 5 metres from where the cable was left, there may be an extra charge and another visit, delaying your installation.
  • Repairs are promised. Gigaclear's terms commit it to minimise disturbance and repair, to your reasonable satisfaction, damage it or its contractors cause. If something is left damaged, see what to do if an engineer damages your home.

Overhead, ducted or buried: how the fibre reaches you

Gigaclear uses three installation types, set by how your area's network was designed.

Type

What happens (Gigaclear's description)

Changes to your property

Overhead

Fibre runs from the nearest usable telephone pole, following your existing phone line's route where possible

No alterations to the fabric of the property; occasionally a new bracket on the outside wall

Underground, existing ducting

Fibre runs from the nearest usable underground chamber (Gigaclear's or another company's) through the existing duct, a buried pipe that carries cables

No alterations to the fabric of the property

Underground, traditional

Fibre runs to a POT at your boundary, then the cable is buried in your garden up to the house wall

Digging in the garden, which Gigaclear says it leaves as close to its original state as possible

If the BT duct it planned to reuse turns out to be blocked or broken, Gigaclear may fall back on the traditional buried method instead. See blocked ducts and stalled installs for what that can mean for timing.

Gigaclear needn't install until it has the consents needed: your landlord's if you rent, or a wayleave (a legal agreement to use someone else's land) where the route crosses a neighbour's property. See broadband wayleaves for who signs what.

When your installation isn't standard

Gigaclear says most installations meet its standard criteria. The exceptions it names include:

  • Listed buildings. Gigaclear says you need Listed Building Consent from your local council before any installation work is done. See full fibre in listed buildings for what to discuss with the council.
  • A long distance from your boundary to the building, longer than can be done in the standard time.
  • Hard surfaces such as block paving, concrete or tarmac, which need specialist engineers.
  • Specific route requests from you, which may need a contribution.

When the outside team finds one, it stops and surveys the property, on the spot if possible or by appointment, and only then discusses whether you contribute, which it says happens in a small number of cases. Any cost is agreed before work starts, confirmed in writing and taken with your first monthly payment.

If you know your home is likely to be non-standard, say so when you order so Gigaclear can go straight to a survey. Before agreeing to any contribution, ask what makes the job non-standard, whether a cheaper route exists, and what happens if you don't go ahead.

Installation day, step by step

Gigaclear describes the day:

  1. A text when the engineer is on the way. Arrival is between 8am and 6pm, so keep the day free.
  2. Agreeing the access point. You and the engineer agree where the fibre comes into the house.
  3. Two wall boxes. The engineer secures a wall box outside and another inside, which involves drilling, including a new access hole through the wall.
  4. Router location. You agree the best spot for the router to get good speed and coverage.
  5. Activation and a speed check. The engineer activates the service and confirms the speed.

The visit takes around two hours. Before the day, check:

  • Power sockets: two free sockets for Gigaclear's equipment, plus two more if you've ordered Home Phone.
  • Who'll be home: an adult over 18 with authority to decide for you, briefed on where you want the cable and router.
  • Access: clear the inside wall where the cable will enter and the spot where you'd like the router.

If the visit can't be finished

The service should be activated on the day, but on rare occasions it can't be, and Gigaclear's terms don't guarantee the date. A further appointment is needed if work can't continue because of safety, a network fault outside your home, complexity or missing materials; you may be charged if the failure was your fault. Refusing access without good reason can lead to cancellation and an aborted-visit charge. If nobody over 18 is there, you'll be offered the chance to make other arrangements. If a job is left unfinished, ask what happens next and who will contact you.

Wi-Fi set-up: where the eero goes

Every Gigaclear package includes an Amazon eero Wi-Fi 7 router: the eero 7 up to 600Mbps, the eero Pro 7 above that (checked October 2026). Where an engineer connects your home, they set the eero up and position any eero devices for the best coverage, at no extra cost.

Smart WiFi, Gigaclear's mesh system (linked eero units that spread one network round the house), is included on selected higher-speed packages and is otherwise an add-on. It comes in three tiers, up to Smart WiFi Max for homes up to 3,500 sq ft. Gigaclear lists its WiFi Guarantee, a strong connection in every main room, as standard on every package; if it isn't met, it says you can cancel the Smart WiFi add-on and get a month's broadband free. See provider Wi-Fi guarantees explained.

Gigaclear says rural homes' larger layouts, thick walls and outbuildings can disrupt Wi-Fi, so use the engineer's time:

  • Show them where you most need Wi-Fi: a home office, an annexe, a garden room.
  • Ask whether a mesh unit or a cable would serve an outbuilding better; see mesh Wi-Fi versus extenders.
  • Ask for a quick tour of the eero app, used to manage devices.

ISPreview notes that eero routers often lack some advanced settings and extra ports, and rely on an internet-dependent app. If you need wired ports for a desk, TV or console, count them before the engineer leaves.

Already connected? Self-install within seven days

If your home already has Gigaclear's equipment, perhaps from a previous occupant, you won't need an engineer. Gigaclear delivers the router and other kit before your switch date; you set it up, eero devices included, with its guide, and are up and running within seven days. See how to self-install broadband.

Switching to Gigaclear with One Touch Switch

One Touch Switch is Ofcom's switching process, live since 12 September 2024 (as reported by ISPreview). With Gigaclear it's optional:

  1. You contact only Gigaclear with details of your current provider and services; you don't give notice yourself.
  2. Your current provider must send you the switching information, by email, text or post. This includes any early termination charges and any services you'd lose by switching.
  3. You consent, then Gigaclear places the order and tells your current provider.
  4. Your old service carries on until Gigaclear's is installed and activated. Then your old provider ends the services you're not keeping and sends a final bill.

ISPreview's report of Ofcom's rules adds two protections: no fees for any part of your old notice period after the switch date, and a gap of no more than a working day, where technically possible, between the old service ending and the new one starting. Gigaclear-specific details:

  • Home phone switches are done by phone. Broadband can be switched online, but Home Phone means calling Gigaclear, which gives you a temporary number while it transfers yours. Its switching page says you can't use your usual number meanwhile; its Home Phone page says you can until the transfer completes, so ask Gigaclear which applies. The transfer takes up to 10 working days (about two weeks) from installation, and Gigaclear emails you when it's done. See keeping your landline number when you switch.
  • Home Phone needs power. It runs over your broadband, and GOV.UK notes digital landlines won't work in a power cut without backup power. Gigaclear's Battery Backup Unit, sent on request, should keep Home Phone going for at least an hour, but can't power a DECT cordless phone, so keep a corded one. Gigaclear doesn't recommend Home Phone for anyone who relies on a landline because of disability or accessibility needs and has no other way to reach emergency services in a power cut; talk to it before ordering; see digital landlines in a power cut.
  • Not for home movers. It only works at the same address; if you're moving, read broadband when moving home.
  • Not using it? Don't cancel your old provider until Gigaclear's service is working. If you're keeping your landline number, wait longer: Gigaclear says not to cancel your old phone service until its email confirms the number has transferred, or the number may be permanently lost.

For residential One Touch Switch orders, Gigaclear's compensation scheme pays bill credits if your service isn't switched on by the end of the confirmed switch date, or if an engineer misses a confirmed appointment (more in the FAQs below). See broadband automatic compensation and broadband switching problems.

Contract dates, cooling-off and what stays behind

  • Your contract starts at activation. Gigaclear's 18-month minimum term starts on the Activation Date, when the service is installed and switched on, not when you order.
  • Cooling-off. You have 14 days, from the day after your order confirmation, to cancel in writing. If the service starts within that time you pay for what you've had. Gigaclear's FAQs add that one-off activation fees aren't refunded once you've been activated, and that if you asked for installation during cooling-off it won't refund any installation charge that applied to you. Standard installation is free on its packages. See the broadband cooling-off period.
  • The network equipment stays. Cable, brackets, ducts and both wall boxes stay whether or not you, or a future owner, use Gigaclear. The router remains Gigaclear's property.
  • Changes during the contract. Gigaclear gives at least a month's notice of a price change, and you can leave within 30 days of being told about a change that isn't solely to your benefit. See your rights when a broadband contract changes.

How Gigaclear compares with other rural installs

Truespeed, and Quickline on full fibre, also do outside work before the engineer's visit, while Quickline's fixed wireless survey happens at the start of the installation visit itself. Booking windows, surveys and non-standard rules differ between networks; compare our guides to Truespeed installations, Quickline installations and Fibrus installations.

Gigaclear may not be your only choice: compare broadband deals at your postcode through our comparison partner, look at fibre broadband deals or browse broadband providers. We don't switch you or review providers; your contract is with the provider.

Your Gigaclear installation checklist

  • Confirm whether you're ordering from Gigaclear or a partner on its network.
  • Book a date 14 to 90 days ahead; flag a listed home, a long drive, hard surfaces or a landlord at once.
  • Read the switching information your current provider sends you, and don't cancel an old phone line until your number has transferred.
  • Say early where you want the cable to enter, and agree the router spot before any drilling.
  • Free two sockets (four with Home Phone) and have an adult with authority home from 8am to 6pm.
  • Afterwards, run our broadband speed test on a device plugged into the router.

Gigaclear installation FAQs

How long does it take to get a Gigaclear installation date?

Gigaclear lets you book an installation between 14 and 90 days after you order, and says dates are typically available within around three weeks (checked October 2026). You can pick it at checkout, from your confirmation or follow-up email, or in the customer portal. Homes already connected to the network skip the engineer visit and self-install instead.

Do I need to be at home for Gigaclear's pre-installation work?

No. Gigaclear says its engineers do the outside work before your booked date and leave a coil of fibre at your wall without you needing to be in; they knock if you're home. If you'd rather be consulted on the cable route, Gigaclear says a chargeable survey may be needed, so contact its Customer Enablement team before the work starts.

Will Gigaclear dig up my garden or drive?

It depends on how your area was built. Overhead and existing-duct connections don't alter the fabric of the property. The traditional method buries cable in the garden from a boundary box, which Gigaclear says it leaves as close to its original state as possible. Block paving, concrete or tarmac can make the job non-standard, in which case Gigaclear surveys first.

Do I need to cancel my old broadband before Gigaclear is installed?

No. With One Touch Switch you contact only Gigaclear, your current provider must send you the switching information including any early termination charges, and your old service runs until Gigaclear's is activated. If you aren't using One Touch Switch, Gigaclear recommends not cancelling your existing provider until the new service is installed and working. Keeping your landline number? Gigaclear says not to cancel the old phone service until your number has transferred, or it may be permanently lost.

What if my home is already connected to Gigaclear's network?

Then you shouldn't need an engineer. Gigaclear says it delivers the equipment, including the eero router, before your switch date, and you set it up yourself using its self-install guide, with the service up and running within seven days. You position any eero mesh units yourself.

What happens if the Gigaclear engineer doesn't turn up?

Contact Gigaclear to rebook (Customer Services: 01865 591 131). If you ordered through One Touch Switch as a residential customer, its compensation scheme pays a bill credit for a missed confirmed appointment, in line with Ofcom's requirements, unless Gigaclear gave at least 24 hours' notice of the change or agreed a same-day time change with you. The amounts are adjusted each 1 April in line with CPI inflation.

Will I pay extra for a non-standard Gigaclear installation?

Possibly. Gigaclear says listed buildings, a long distance from the boundary to the house and hard surfaces can be non-standard; it surveys first and asks for a contribution only in a small number of cases. Any cost is agreed before work starts, confirmed in writing and taken with your first payment. It doesn't publish typical amounts, so ask why and for the exact figure.