Full fibre & networks

How to upgrade to full fibre broadband

How to upgrade to full fibre broadband

Part fibre, cable and full fibre: what you're upgrading from

Homes not yet on full fibre are usually on one of two older connections. Part fibre (often called FTTC, fibre to the cabinet) runs fibre to the green street cabinet and then uses the copper phone line for the last stretch into your home. Openreach, BT Group's network business (BT Group says it supplies more than 700 providers), says its part-fibre service reaches up to 76Mbps download and 15Mbps upload, with your actual speed depending on how far you are from the cabinet. Cable is Virgin Media's older network: fibre to the street cabinet, then coaxial cable to your home.

Full fibre (FTTP, fibre to the premises) takes fibre all the way into your home, where it ends at a small box on the wall called an ONT (optical network terminal) that your router plugs into. Our guide to what full fibre broadband is has the background.

You can upgrade with your current provider or switch to one that sells full fibre at your address. Facts checked October 2026.

Step 1: check you can really get full fibre

Full fibre is available to an address, not just to a town or a street, so check your own postcode with your provider and with other providers' checkers. Our guide on how to check full fibre availability explains the checkers and their results.

Don't rely on the word "fibre" alone. Since 16 September 2024 Ofcom, the UK communications regulator, has required providers to label the technology full-fibre, part-fibre, cable or copper before you buy and in your contract summary. A deal labelled "part-fibre" isn't the upgrade you're after.

To see full fibre deals for your home side by side, enter your postcode in the comparison on our fibre broadband deals page. It shows live deals from our comparison partner; it doesn't place orders or switch you itself.

If your exchange is under a "stop sell"

Openreach gives 12 months' notice before an exchange comes under its FTTP Priority Exchange stop sell, which applies once it reaches 75% ultrafast coverage there. After that, homes that can get full fibre can only order full fibre as a brand-new line; copper and part-fibre products are no longer sold for new orders. Existing customers can keep their current product until it's withdrawn.

That doesn't mean every switch has to be full fibre. Under Openreach's "40/10 Bandwidth Rule", if you already have an active part-fibre service you can change provider and stay on a part-fibre service of 40Mbps download and 10Mbps upload. So if you're switching in a stop-sell area, check which technology you're actually being sold. Our guide to the Openreach stop sell explains the stages.

Option 1: upgrade with your current provider

Openreach says that when its Full Fibre reaches your address, you upgrade from part fibre through your broadband provider, not Openreach. Here's what the providers whose pages we could check say (October 2026); where a cell says "not stated", ask.

Provider

How existing customers upgrade

Contract length

BT

Its Full Fibre page says "Already with us? Log in to upgrade", meaning My BT

BT's terms say broadband packages are on 12- or 24-month contracts, subject to a credit check and availability; the Full Fibre deals listed in October 2026 were 24-month

Plusnet

Remote activation usually within 3 working days if a Full Fibre connection is already in place; otherwise an engineer visit, usually within 3 to 10 working days

Its broadband packages are 24-month contracts

Zen

Online by logging in, by phone or by live chat; installation typically within 6 to 20 working days

Not stated on its upgrade page

Rebel Internet

Its terms promise part-fibre customers a free full fibre installation when full fibre reaches the home, if the account is in good standing and you choose a Rebel full fibre package

Not stated

See BT broadband deals, Plusnet broadband deals and Zen broadband deals for each provider's current packages at your postcode. Plusnet's full fibre is broadband only, so read the landline section below before you order.

Two other moves worth knowing about. Sky launched a 1.6Gbps full fibre tier on Openreach on 25 September 2026 for new customers and said existing customers would be able to upgrade later (see Sky broadband deals). NOW's Speed Guarantee says that if your download speed stays below the guaranteed minimum for three or more consecutive days, you can leave without early termination charges or upgrade without upfront fees.

We couldn't find a current help page from Sky, Vodafone, EE, TalkTalk or Virgin Media on how existing customers move to full fibre, so ask them through your account and get the answers in writing.

If a full fibre box is already on your wall

If a previous occupant had full fibre, there may already be an ONT in your home. That can make the upgrade much quicker. Plusnet says that where a Full Fibre connection is already in place, service is usually activated remotely within 3 working days, while a new installation needs an engineer visit and possibly an Openreach survey first. Fibrus also says it can activate service remotely where an Openreach ONT is already fitted. Mention it when you order; our guide to the full fibre ONT explains what it is.

Questions to ask your provider before you agree

  • Is it labelled full-fibre, and which speeds can I get here?
  • Will this start a new minimum term? Is there a 12-month option?
  • What's the monthly price, how can it rise, and are there one-off charges?
  • Do I need an engineer visit, and when?
  • What happens to my landline, number and anything connected to the line, such as an alarm?

Compare the offer with the deals the comparison shows for your postcode. Citizens Advice (in its advice for England) notes that if you tell your provider you're thinking of switching, it may offer a better deal to stay.

Does upgrading mid-contract start a new minimum term?

Often, yes, but not without your agreement. An upgrade to full fibre is usually a new product, and providers often treat it as a new contract with a fresh minimum term (the period you're committed to before you can leave without paying early termination charges). What the rules stop is a provider quietly extending your contract.

Even on networks that are already full fibre, moving to a faster package usually resets the clock. Airband says upgrading starts a new contract, including for customers on a 30-day rolling contract, and that you can't downgrade until the current term ends. Rise Fibre's terms say you can upgrade at any time by committing to a new contract, without early termination charges on the old one. YouFibre's October 2026 offers for upgrading customers need a new 24-month term.

What Ofcom's rules say

Ofcom's General Conditions are the rules every UK phone and broadband provider must follow. The ones that matter here:

  • A 24-month maximum. Condition C1.11 bars minimum terms longer than 24 months (other than instalment contracts for a physical connection) and requires providers to offer at least one contract of no more than 12 months.
  • No silent extensions. Condition C1.12 says a provider can't extend your contract's duration when you add a service or equipment unless you expressly consent.
  • Information before you're bound. Before a new contract (including a re-contract), the provider must give you contract information, including early termination charges (C1.3), and a free contract summary (C1.5). The contract only takes effect once you give express consent after receiving the summary (C1.6).

Providers don't always get this right, and it matters when they don't. Ofcom fined BT £2.8 million in 2024 after EE and Plusnet failed to give about 1.1 million customers the required summary and information, saying those contracts weren't binding, so an early exit fee shouldn't have been payable. BT refunded or credited £18 million (reported July 2025).

Check the contract summary before you say yes

For an upgrade, the summary's duration, renewal and termination section shows the new minimum term and the cost of leaving early. Also check the full-fibre label, the minimum speeds, the price and any rises. If you're asked to agree before you've seen a summary, ask for it first: you're entitled to it before you're bound. Our guide to the broadband contract summary walks through each heading.

When is the best time to upgrade?

If your provider won't charge you for ending the old deal, timing matters less. If it would, the cleanest moment is the end of your minimum term. Providers must send an end-of-contract notification before it ends, showing what you pay now, what you'll pay afterwards and their best deals: your prompt to compare. Our guide to end-of-contract notifications explains what it must include.

Option 2: switch to a different provider for full fibre

You don't have to stay with your current provider to get full fibre. Another provider may sell full fibre at your address when yours doesn't, or offer a deal that suits you better. Our broadband providers hub lists the providers we cover, including the smaller full fibre networks known as altnets.

How the switch works

Ofcom says switching broadband is done with One Touch Switch, its process that went live on 12 September 2024 and works between different networks too (for example from an Openreach-based provider to CityFibre or Virgin Media). You contact the new provider with your address, the services you want to switch and your current provider; you don't need to cancel with the old one. Your current provider sends you key information, including any early termination charges, and the old service continues until the new one works, then ends automatically.

Under Ofcom's rules any loss of service must not last longer than one working day, and the old provider can't charge for a notice period after the switch date. If you arrange your own overlap instead, you're outside One Touch Switch.

With a smaller network, ask how the switch will work before you order. Connect Fibre's support page, for example, says that because it built its own network your old service isn't automatically cancelled when it connects you, so you contact your old provider yourself, and it recommends doing that only once its service is up and running.

Exit fees if you're mid-contract

Citizens Advice says you'll usually be charged an exit fee to leave before the end of a fixed-term contract, and it may be better to wait until it ends. The switching information your current provider sends will show the figure. Weigh it against what you'd gain. A few providers offer help with this: Vodafone, for example, says it offers switching credit towards leaving fees on eligible 24-month full fibre plans bought directly from it, claimed after activation (checked October 2026). See Vodafone broadband deals, and check the current terms before relying on it. For situations where you may be able to leave without paying, see our guide to leaving broadband without an exit fee.

Changing your mind

Ofcom says you can cancel a new order within 14 calendar days. If the service has already started you may pay for what you used and for installation, and your old service isn't automatically reinstated. Citizens Advice notes there's no legal cooling-off right if you sign up in person, such as in a shop. More in our broadband cooling-off period guide.

What happens on installation day

Unless a full fibre box can be activated remotely, the upgrade needs an engineer visit. Our guide to what to expect from a full fibre installation covers the day in detail; on the Openreach network the essentials are:

  • Who must be home: a decision maker aged 18 or over, for the whole appointment.
  • Permission: renters need the landlord's permission for drilling, and the engineer may ask you to sign a permission form before digging or drilling.
  • How long: Openreach says most installations take between one and four hours; its installation checklist says it usually takes around four hours. Some take longer, for example if a duct is blocked.
  • What happens: the engineer runs fibre from the nearest pole or underground duct, brings it in through a small drilled hole, fits the ONT, connects your router and tests the line.
  • Where it goes: Openreach suggests a router spot near a double power socket with good Wi-Fi coverage, not a cupboard under the stairs, with the ONT close by. Zen says ONT placement depends on cable length and wall structure.

Lead times vary: Plusnet says a new installation is usually within 3 to 10 working days, Zen typically 6 to 20 working days, and some homes need a survey or outside visit first. Rescheduling goes through your provider. BT, for example, needs at least one working day's notice to change an appointment and says installation charges can't be refunded once work has begun.

Your landline and phone number

Full fibre doesn't use the old analogue phone line. Openreach says your landline moves to a digital phone service through the router. GOV.UK says the change may be as simple as plugging your phone into your broadband router rather than the wall socket, and Ofcom says you can keep your phone number. Traditional lines are going digital anyway: Openreach gives 31 January 2027 as the date.

Provider differences that catch people out:

  • Plusnet: sells broadband-only packages. Its broadband page says taking broadband without a landline means the home phone is disconnected and the number is lost, and in 2024 it confirmed it wouldn't offer home phone to existing customers after the analogue switch-off, pointing them to BT instead. If you want to keep your number, sort that out before you order.
  • TalkTalk: says its Full Fibre works without a landline and its Digital Voice home phone is available to existing customers only.
  • Sky and NOW: on full fibre, calls are made over your broadband. Sky says these products aren't available to customers who rely on their landline for emergency services or have an emergency care alarm, and NOW's terms say something similar.
  • Zen and Vodafone: Zen says its Digital Voice keeps your existing number; Vodafone says you can keep your number when switching.

Keeping your number when you change provider is a regulated right under Ofcom's number portability rules, and Citizens Advice says you should be able to unless you're moving house. Say you want to keep it when you order. Our guide to keeping your landline number when switching has the details.

If an intruder alarm, health pendant or wrist alarm uses your phone line, Openreach advises telling your provider before the installation, and GOV.UK says anyone with alarm systems or telecare devices on the line should contact their provider or the equipment maker. GOV.UK also warns that digital phones and routers won't work in a power cut without back-up such as a battery; see our guide to telecare alarms and digital landlines.

What happens to your old service and equipment

  • If you switch provider with One Touch Switch, your old service ends automatically once the new one works. Any early termination charge will be in the switching information you received.
  • The copper line stays in service until Full Fibre reaches your area, Openreach says, and under a stop sell existing customers can keep their current product until it's withdrawn.
  • Old routers: check whether yours must go back. BT, for example, says replaced hubs must be returned within 60 days or a charge may apply.
  • Virgin Media cable customers: we couldn't find a Virgin Media page explaining how existing cable customers move to its full fibre, or whether that needs a new contract or an engineer, so ask Virgin Media and get the terms in writing. Our Virgin Media network guide explains its two networks, and Virgin Media broadband deals shows what's available at your postcode.

After the upgrade: getting the most from it

  • Test your speed. Use our broadband speed test, ideally on a wired device, and compare the result with the minimum speed in your contract summary. If it's regularly lower, see our guide to the broadband minimum speed guarantee.
  • Changing speed later is easier. Openreach says that once you're on Full Fibre you can change speed tier without another engineer visit, though a change of package may still mean a new contract with your provider.

A worked example

Illustrative example, not a real customer. You're 15 months into a 24-month part-fibre contract and full fibre has reached your street. Check your provider's account area for full fibre deals and ask whether moving starts a new term. Enter your postcode on our broadband deals page to see what others offer. Ask your provider what you'd pay to leave now. If it will move you without charging for the old contract, you're simply comparing new contracts; if switching elsewhere means an exit fee, weigh the fee against the saving, or wait for your end-of-contract notification.

Upgrading to full fibre FAQs

Will upgrading to full fibre start a new contract?

Often it will. Many providers treat a move to full fibre, or to a faster package, as a new contract with a new minimum term. Ofcom's rules say a provider can't extend your term without your express consent and must give you a contract summary before you're bound, so ask to see the summary and check the new term before you agree.

Can I upgrade to full fibre in the middle of my contract?

Usually you can, if full fibre is available at your address. With your current provider, ask whether moving now means a new minimum term and whether you'd pay anything for ending the old deal early. If you'd be switching to a different provider instead, you'll usually pay an exit fee to leave your current fixed-term contract early, so it may be cheaper to wait until it ends.

Do I have to move to full fibre if my exchange is in a stop sell area?

Not straight away. Openreach says existing customers can keep their current product until it's withdrawn, and its rules let you change provider and stay on a 40Mbps download, 10Mbps upload part-fibre service. What stops is new supply: a brand-new line where full fibre is available can only be full fibre.

Can I keep my landline number when I move to full fibre?

Generally yes. Ofcom says a digital landline plugs into your router and you can keep your phone number, and number portability is a regulated right when you change provider. The big exception is Plusnet, which sells broadband only, so you lose the number. Tell any provider you want to keep your number when you order.

How long does a full fibre installation take and do I need to be in?

Openreach says most installations take between one and four hours; its installation checklist says it usually takes around four hours. A decision maker aged 18 or over must be at home for the whole appointment, and renters need the landlord's permission for drilling. If a full fibre box is already fitted, some providers can switch the service on remotely without a visit.

Is full fibre more expensive than my current part-fibre deal?

Not necessarily. In September 2026 Ofcom said evidence shows people can move to full fibre and pay the same as or less than they pay for a copper-based connection, and that it expects providers to help customers find a new deal. Prices vary by provider, speed and address, so enter your postcode in the comparison to see live full fibre deals, and check the contract summary for price rises and one-off charges.

Ready to compare deals at your address?